My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7501 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7501
>
7501 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2017 11:49:41 PM
Creation date
2/9/2017 11:48:25 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DWR CONSULTANTS, Inc., Geotechnical Invesfiga(ion <br />Proposed Saleway Gasoline Station, June 8, 2000 <br />a. Lightly loaded areas (parking and driveways): <br />1. Two inches of Asphalt Concrete (AC) over 4 inches of Crushed Rock <br />Base (CRB) or: <br />2. Two inches of AC ovcr three inches of Asphalt Treated Base (ATB) <br />material. <br />Heavily Loaded Areas (e.g. bus iralficJ <br />1. Three inches of AC o�ar 6 inches of CRB, or <br />2. Three inches of AC over 4.5 inches of ATB. <br />6.4 Excavation of On-Site Soils <br />A maximum 1.5 horizontal to 1 vertical slope is recommended for all unsupported <br />sidewalis. <br />2. Any trenching or excavations more than 4 ft. deep either requires the previously <br />meniioned side slopes or shore/t,race the excavation. A light gray gravel layer <br />with basaltic sand, encountered at Reference Site No. 1, sloughs at <br />approximately 2H:1 V. If a similar layer is encountered at this site, it will require <br />special consideration for trench excavation techniques. <br />The above information on slope protection is based on OSHA regulalions and is <br />provided entirely as a service to our CLIENT. Under no circumstances shouid this <br />information be interpreted to mean that DWR CONSULTANTS, Inc. assumes <br />responsibility for consiruction site safety or the Contractor's activities; such <br />responsibility is not being implied and should not be inierred. <br />6.5 Storm Water Management <br />A standard drywell will percolate at least S ft. per hour in this type of soil. <br />6.6 Structural Fill and Compaction <br />Much of the structural fill requirement has been discussed in previous Sub- <br />sections. There are two ilems not addressed above that require incorporation into the <br />fill requirements tha: are widely recognized guidelines tor (ill operations: <br />The maximum particle size should not exceed 2/3 of the fill layer being placed. <br />2. A loose layer thickness of 8 inches or less provides lhe best compacted soil <br />sirength given and aggregate size of 5 inches or less. <br />Page 9 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.