My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY SAFEWAY 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
7601
>
SAFEWAY
>
7601 EVERGREEN WAY SAFEWAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 4:07:22 PM
Creation date
2/10/2017 12:10:47 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
SAFEWAY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYKEMAN & OGDEN, ARCHITECTS P.S. <br />Mr. Lon Mayborry <br />City of Everett <br />September 6, 1979 <br />Page 2 <br />Re: Cascade Shopping Center - Offsite Improvement Drawings <br />4. 30 ft. radius curbs as noted on the check set do not work <br />at the center driveway on 75t:h St. as they intrude too far <br />into tho size parking area. We have indicated and request <br />approval of 20 ft. ra 'lus curba at the 75th St. Driveways. <br />The 45 ft. width of the center driveway on 75th St., was <br />proposed to give easy access and also to permit easy turning <br />of the large trucks that servo Safeway at other than business <br />hours. <br />S. A full length plan of 75th St. is submitted with our drawings <br />as a supplement so your department can study lane marking <br />requirements and loft turn storage space. This drawing is <br />numbered O.S. Sup. -I. <br />6, We have indicated a connection of the easterly end of the <br />pathway to the sidewalk at Beverly Blvd. However, the City <br />must verity that the right-of-way has been aquirod before <br />this construction .a proceed. <br />7. Buffer landscaping location is shown on drawings suhmizced <br />to the City Building Department on 8/10/79. <br />8. Other review comments have been changed on the drawings. <br />Our drawings were submitted to Celia Strong 7/27/79 with a <br />letter stressing our concerns about timing. A copy of that letter <br />is attached. <br />'pis. Strong in a letter dated 7/31/79 requested four (4) more <br />sets of drawings that :reek. We delivered those drawings 80 09 . <br />A copy of that letter is attached. <br />The above mentioned letter indicated that review would take <br />10 to 15 working days. I picked up the review set 8/30/7U with <br />comments that two driveway widths could not be approved without <br />internal circulation plans. Internal circulation plans or more <br />specifically the parking layout were filed with the City Building <br />Department 8/10/79 and presumably were circulated to yaur depart- <br />mont. These drawings were found 8/30/79 after considerable <br />searching in the Engineering Department offices and apparently <br />were not reviewed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.