Laserfiche WebLink
Embar Equities Corporation E-2773 <br />November 4, 19D5 Page 6 <br />Structural fill is defined as any fill placed under buildings, <br />roadways, slabs, pavemente, or any other load bearing areas. <br />Structural fiil under floor slab� and footings ahould be <br />placed in horizontal lifts and canpacted to a minimum 95 percent <br />of the maximum dry density in accordance with ASTM Test Designa- <br />tion D-1557-70 (Modified Proctor). The fill materials should be <br />placed at or near the optimum moisture content. Fill under <br />pavements and walks should al.so be plaaed in horizontal li.fts and <br />compacted to 90 percent of rnaximum density except for the top <br />twelve (12) inches which should be compacted to 95 percent of <br />maximum density. <br />On-site soils at the time of our e:sploration were near the <br />optimum moiature content and may be used as atructural fill <br />provided the grading operations are conducted duzing dry weather. <br />However, the on-site soils have a significant amount of fines. <br />Thus, compaction and grading will be difficult if the soil <br />moisture increases above t•he optimum moisture content. Unless the <br />moisture content can be reduced, it may be necessary to use <br />imported granular soil as atructural fill. The moisture content <br />can be reduced by aeration in dry weather or using lime or cement <br />stabilization. Ideally, etructural fill to be placed in wet <br />weather should conaist of a granular material with a maximum size <br />of three inches and no more than 5 percent fines passing the No. <br />200 sieve. During dry westher, any compactible non-organic soil <br />can be used as atructural fill. <br />gIg1,D gXPIARATION AND 7,11SORATORY' TESTING <br />Our field exploration was performed on October 10, 1985. The <br />subsurface conditions were explored by excavating ni.ne test pits <br />to a maximum depth of ten feet below the existing surface at the <br />approximate locations shown on Plate 2• <br />The locations of the teat pits were approximately determined <br />by taping from surveyed property corners. Elevations of test pits <br />were approximately determined by extrapolatien from the site <br />boundary and topographic survey. 'I'he locations and elevations of <br />the test pite ehould be considered accurate only to the degree <br />imp�ied by the method used. <br />R'he field exploration was contir.uously monitored by an engi- <br />neering geologist fran our firm who classified the aoils <br />encountered, maintained a log of each test pit, abtained <br />representative bulk eoil samples and observed pertinent site <br />features. Soils were claesified visually in the field according <br />to the Unified Soil C2assification System which is presented on <br />Plate 3, Legend. The consistency of the soil was estimated based <br />on the effort required to excavate the soil, the stability of the <br />Earih Consuhants, Inc. <br />