My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7920 EVERGREEN WAY 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7920
>
7920 EVERGREEN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 10:38:43 AM
Creation date
2/10/2017 12:46:44 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7920
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GECTECHNICAL ENGINEE( 'G STUDY r <br />McDonald's Corporation E-8879 <br />August 30, 1999 Page 7 <br />Pavement Areas <br />The adequacy of site pavements is related in part to ihe conditi�n of the und�rlyinA subgrade. <br />To provide a properly prepared subgrade for pavements, we recommend th, suUgrad� b�� <br />treated and prepared as described in the Srte Preparation ai�d Grading s�=cr���n oi tliis re��,,c��2. <br />This means at least the top twelve (12) inches of the subgrade sliould b� cor•,�;::�::� :.; �� ;)b <br />percent of the maximum dry density lper ASTM D-1557-78) and be stable. (t :; 'iliva'ole th•3t <br />some localized areas of soft, wet or unstable subgrade rnay siill exist att;:r tliis process. <br />Therefore, replacement witli structural fill or crusl•�ed rock may he needed to stabilize these <br />localized areas. <br />The following pavement sections are recoinrriended for lightly loaded areas: <br />• Two inches of asphalt con�rete (AC) over four inahes of crushed rock base (CRB) <br />material, or <br />+ Two inches of AC over three inches of asphalt treated base (ATB) material. <br />Heavier truck-traffic areas will require thicker sections depending upon site usac�e, pavement <br />life and site traffic. As a general rule, the following sections can be considered for heavily <br />truck-trafficked areas: <br />� Three inches of AC over six inches of CRB, or <br />� Three inches of AC over four and one-half inches of ATB. <br />Asphalt concrete {AC1, asphalt treated base (ATB), and crushed rock base (CRB) materials <br />should conform to WSDOT specifications. All rock base should be compacted :o at least 95 <br />percent of the ASTM D-1557-78 laboratory test standard. <br />LIMITATIONS <br />Our recommendations and conclusions are based on tha site materials observed, selective <br />laboratory testing and engineering analyses, the design information provided us by you� <br />architect, and our experience and engineering judgernent. The conclusions and <br />recommendations are professional opinions derived in a manner consistent with that level of <br />care and skill ordinarily exercised by other members of the profession currently practicing <br />under simila�� conditions in this area. No warranty is expressed or implied. <br />The recommendations submitted in this report are based upon the data obtained from the <br />borings. Soil anti groundwater conditions between borings may vary from those encountered. <br />The nature and extent of variations between our exploratory locations may not become <br />evident until construction. If variations then appear, ECI should be requested to reevaluate <br />the recommendations of this report and to modify or verify them in writing prior to proceeding <br />with the construction. <br />Eerth Canauhente, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.