My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8130 EVERGREEN WAY BASE FILE 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
8130
>
BASE FILE
>
8130 EVERGREEN WAY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 2:16:54 PM
Creation date
2/10/2017 12:59:44 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8130
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Temporary Eroslon Sediment Control (TESC) <br />A temporary erosion sediment control plan has been generated to inciude a stabilized <br />construction entranr,e, catch basin protection and silt fence where necessary. <br />In addition, sound construction practice and specific measures should be taken to ensure that no <br />soil or contaminated water leaves the site. 'o insure this, notes have been added to the <br />documents to address guidelines and requirements for site protection and clean up during <br />construction. <br />• The TESC Notes require the Contractor to address the cor.trol of construction-generated <br />pollutants including sediment laden runoff and air pollution. <br />The site should be monitored during and after large storm events. The TESC Plan is <br />considered minimum requ!rements for BMP and extra measwes may be required to prevent <br />excessive erosion during large storm events. <br />Pem�snen4 Stormweber Plan <br />The detention system is designed per the requirements in City of Everett Stormwater <br />Management Manual to detain the two, ten and one hundred-year developed design storm <br />events and release stormwater at a rate of one-half the two, the ten and the one hundred-year, <br />twenty-four hour, pre-developed design s?orm events. <br />Proposed release rates: <br />Qs.,��. = 0.04 cfs <br />Qio-r�e� = 0.16 Cf5 <br />Qioo-yea, = 0.36 cfs <br />(referto hydrographsin Appendix A) <br />The stormwater management system wili include catch basins and pipes to collect and convey <br />runoff from the impervious area to the proposed detention system. The det�ntion calculations <br />show that a trapezoidal pond"5�t-long-by 21'fee�wide will be needei to meet the required <br />release rates. The correction�faPtoF-bas�mpervious cover is C.42. The design of the <br />detention pond is provided in� ndix A. <br />�c;v�a � {�c�cf I -,,�-i-l„ �•�cl w'.c( f�, <br />eICCGUn r; 1�!' -��n.�_ C.C;rr r=� .I-.-r) Ur..iv:�'l,P , <br />May 2003 <br />20(6 <br />A6KJ, Inc. <br />/S <br />
The URL can be used to link to this page
Your browser does not support the video tag.