My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10701 EVERGREEN WAY 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
10701
>
10701 EVERGREEN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 1:26:08 PM
Creation date
2/10/2017 9:36:12 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10701
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terra Firma ��� <br /> Noordin & Sayani Site <br /> Traffic Impact Analysis <br /> Page -2- <br /> December 14, 1968 <br /> center two way left turn lane, and three through lanes in each <br /> direction, including 13' wide curb lanes and other through lanes <br /> at 11' widths. The curbs, gutters, and sidewalks end at the city <br /> limits at the unopened 108th St. S.W. right of way. South of <br /> 108th, SR 99 has five lanes and paved shoulders. The tapers from <br /> the five lane width to the sevtr. lane width occur immediately <br /> north of lOBth St. Southwest. Evergreen Way is straight and <br /> relatively flat, and siqht distances are qood. <br /> At the proposed site driveway, the southbound posted speed <br /> limit is 40 MPH. The southbound speed limit changes to 50 MPH <br /> just south of the proposed driveway, within the taper from three <br /> to two southbound through lanes, The proposed driveway is within <br /> the 50 MPH to 40 MPH speed reduction zone for northbound traffic. <br /> "Reduced Speed Ahead - 40 MPH" siqns are located just aouth of <br /> the proposed driveway� and the 40 MPH speed limit is posted north <br /> ,f the driveway. <br /> TRIP GENERATION AND DISTRIBUTION <br /> Table 1 shows the estimated vehicular trip qeneratio� for AM <br /> and PM street traffic peak hour conditions and for an average <br /> weekday. Since the tenants of the project are not known at this <br /> time, the nature of the truck traffic entering and exiting the <br /> project cannot be predicted with certainty. Aowever, based on <br /> the preliminary site plan, eatimates of site-qenerated truck <br /> traffic have been made for the purposes of this analysis, as <br /> ahown in Table 1 . <br /> Most of the site-generated trips will comprise new traffic <br /> added to Everqreen Way. It is eatimated that about half of the <br /> sfte-generated traffic will use Evergreen Way to and from the <br /> north, and about half will use Evergreen Way to and from the <br /> south. <br /> TRAFFIC VOLUMES <br /> Table 2 shows traffic volumes on Evergreen Way south of <br /> Everett Mall Way, The 1988 and 1990 without project volumes <br /> shown are from the Walden Pond A artments Traffic Im act Anal sis <br /> prepared by Transportation P ann nq 6 Engineer ng, Inc. (TP6E) n <br /> October, 1988. The 1988 traffic volumes are from City of Everett <br /> counts. The 1990 without project volumes include 4.28 per year <br /> compounded background traffic volume growth, and projected <br />
The URL can be used to link to this page
Your browser does not support the video tag.