My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7815 E GLEN DR 2016-01-01 MF Import
>
Address Records
>
E GLEN DR
>
7815
>
7815 E GLEN DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 8:10:34 AM
Creation date
2/11/2017 8:10:25 AM
Metadata
Fields
Template:
Address Document
Street Name
E GLEN DR
Street Number
7815
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
After overexcavation/stripping has been performed to the satisfaction of the geotechnical <br /> engineer/engineering geologist, the upper 12 inches of exposed ground should be recompacted <br /> ro a minimum of 9Q percent of the modified Proctor maximum density using AST'M:D 1557 as <br /> the standard. If the subgrade contains too much moisture, adequate recompaction may be <br /> difficult or impossible to obtain and should probably not be attempted. In lieu of � <br /> recompaction, the area to receive fill should be blanketed with washed rock or quarry spalls to <br /> act as a capillary Ureak between the new fill and the wet subgrade. <br /> After recompaction of the exposed ground is tested and approved, or a free-draining rock <br /> course is laid, strucnual fill may be placed to attain desired grades. <br /> Structural fill is defined as non-organic soil, acceptable to the geotechnical engineer, placed in <br /> maximum 8-inch loose lifts, with each lift being compacted to a minimum of 95 percent of the <br /> modified Proctor maximum densiry using ASTM:D 1557 as the standard. The top of the <br /> compacted fill should extend horizontatly outward a minimum distance of 3 feet beyond the <br /> location of the peruneter footings or pavement edge before sloping down at an angle of 2H:1 V. <br /> The contractor should note that any proposed fill soils ruust be evaluated by Associated Earth <br /> Sciences, Inc. (AESn prior to their use in fills. This would require that we have a sample of <br /> the matcrial 48 hours in advance to perform a Procror test and determine its field compaction <br /> standazd. Soils in which the amount of fine-grained material (smaller than No. 200 sieve) is <br /> greater than approximately 5 percent (measured on the minus No. 4 sieve size) should be <br /> considered moisture-sensitive. Use of moisture-sensitive soil in structural fiqs should be <br /> limited to favorable dry weather conditions. The on-site lodgement till sediments are suitable <br /> for use as structural fill, however, much of this ►r'.aterial was wet at the time of our site visit <br /> and L5e specified compaction may not be achievabie without prior moisture conditioning. In <br /> addition, construction equipment traversing the site when the soils are wet can cause <br /> considerable disturbance. If fill is placed during wet weather or if proper compaction cannot <br /> Ue obtained, a select import material consisting of a clean, free-draining gravel and;or. sand <br /> should be used. Free-draining fill consists of non-orgar.ic soil with the amount of fine-grained <br /> material limited to 5 percent by weight when measured on the minus No. 4 sieve fraction. <br /> A representative from our firm should inspect the stripped subgrade and be present during <br /> placement of structural fill to observe the work and perform a representative number of in- <br /> place density tests. In this way, the adequacy of the earthwork may be evaluated as filling <br /> progresses and any problem areas may be conected at that tune. <br /> 11.0 FOUNllATIONS <br /> Substantial thicknesses of uncontrolled fill and loose, organic topsoil or topsoil fill are present <br /> beneath the area of the proposed building. The depth to bearing soils in the exploration pits <br /> excavated for our study ranged from approximately 6 co 7 feet and is andcipated to be <br /> somewhat deeper than this range along !he west side ef the proposed buiiding. Presented <br /> below are tH�o options for foundation suppor[. <br /> 10 <br /> �,�y. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.