Laserfiche WebLink
shoreline is provided off 131h and 141h Slreels. 13th Street terminates at the <br /> edge oi Ihe shoreline al tlie west end of the site. 141h Street extends parallel to <br /> lhe shoreline. (exhi6it 1-staff report) <br /> Thefe iS a "0" (oot setback for waler-dependent uses located on 1he shoreline. <br /> The water-dependent uses of the proposed project include the marina and boat <br /> repair. A porlion of Ihis project would extend to the shoreline in limited locations <br /> in order to provide a direcl access for the marina boal launch. With that <br /> exception, the shoreline would be dedicated for pubiic access, anC all setbacks <br /> would be saiisfied. (exhibit 1-sfaff repo�t) <br /> 19. The PDO zoning and Development Agreement adopted height restridions <br /> speciftc to the pro�ect. The oAginal Development Agreement identified two heighl <br /> zones in various blocks of Wesl Marine Vew Drive. The majority of buildin,qs <br /> would be 35 feet or less, and the maximum building height would be 95 fee . In <br /> the November 2005 Amendment, the Everetl City Council approved an increase <br /> in the allowable building heights at certain ioptions o(the site. However, all <br /> Phase#1 slructures would be construded belween 1610 35 feet in height. <br /> (exhibit 1-staff report, page 6; Resolution 5703; exhibit 17-ApplicanYs Power <br /> Polnt, page 27; Russell tesbmony) <br /> 20. The projecl woutd consist of improvements in marina support facilities along the <br /> 121h Street Marina and adjaceni to the marina's guesl float access gate. The <br /> Applicant proposed construction of a two-slory, 16,000 square foot stnidure ihat <br /> would ��rovide retail/marine services and boating ciub/guest(loat services. The <br /> flrst level of the building would be (or retaillmarine services and would InGude <br /> restrooms, showers, and laundry faGlities for lhe public boaiing use. The second <br /> levet would be used for boating club mee6ng�and social events. (exhibit 3- <br /> Applican!'s Narrative; exhibit 12, page 6; exhibif 17-ApplicanPs Power Point <br /> pages 20& 21) <br /> 21. Marine support facilities would be provided along lhe 14th Sireet walkway. The <br /> Applicant proposed to construcl lwo commercial buildings (each which would be <br /> 11,200 square feet), and an administrapve service building, courl storage areas, <br /> and lwo public restrooms/shower/laundry facilities would be loqted near the <br /> rr�in gate/pier access from the 141h Street rnarina. Developmenl of ihis area <br /> would necessilate relocalion of a fuel storage lank and ihe inslaliation ai new <br /> underground ulilities. (exhibit 1-staKreporf; exhibit 3-ApplicanPs Narrafive, page <br /> 4; exhlbft 12, pages 10 8 11;exhibif 17-App/rcant's Power Point, pages 12-14) <br /> 22. The proposed Craftsmen District is an area that would provide open and covered <br /> workspace for repair of boats that extend l0 75 feel in length. It would also <br /> provide boat wash-down (acilities, a boat trailer drop-off area, marina operations <br /> office, and public reslrooms. The existing 36,000 square foot structure on-site <br /> would be renovaled and expanded lo A6,500 square feet lo accommodate <br /> potential marine oriented businesses. Three additional sales/service buiidings <br /> that would be conslrucled wouid provide space for marine operalions and public <br /> restrooms°. Water treatmenl facililies would be instailed lo accommodate boat <br /> yard activities and protecf water quality. (exhibit t-sfaff report; exhibit 3- <br /> Applican('s Narrative, page 3; exhibit 12, pages 4&5; exhibit 17-Applicant's <br /> Power Poinf, pages 24&25; Russell festimony) <br /> 'A toml of 4,000 s� �re fcct. <br /> 9 <br /> 1�3 <br />