Laserfiche WebLink
, <br /> } _ <br /> 4lESTSIDE FEDERAL - EVERETT <br /> EP:VIROPlMENTAL CHECKLIST <br /> , - page two - <br /> C ofeterrahn wilP�bednecessaryato P1ope9runoffetoward stormmse�aercdra�ns. <br /> This should not significai�tly alter the gently sloping character of the <br /> site. P.lso, some mounding or berming of earth may be debreakeup�n <br /> conjunction with this landscaping to screen or visually <br /> paved areas. <br /> E. Additional surface water run off is expected due to the site coverage <br /> by building and paving. All surface o-;ater, as well as roof drainage <br /> from the building will be channeled into a subsurface storm sewer <br /> system which will eventually be tied into the city storm sewer system <br /> proposed as a part of the S. Broadway improvement. If compl�ets�ons <br /> of the project precedes the improvements to S. Broadway� p <br /> �aould be made for interim storm drainage as required by Everett City <br /> Services Department. <br /> 2. Air <br /> A,B During the construction period there may be additional localized ust <br /> in the air due to grading, as well as occasional object�Oncelc nstruction <br /> rrom construction procedures such as applying roofin9. <br /> is completed, there should be no detrimental effects to air quality due <br /> tu the proposed development. Auto emissions related to this project <br /> would be insignificant compared to present activity in the immediate <br /> area. <br /> 3. 4later <br /> B. As mentioned previously, additional surface water runoff �S SuPface <br /> due to the extent of site coverage by building and paving. <br /> viater runoff would be carried off by an on-site, below-grade storm <br /> se�aer system. No significant change in water quality is expected. <br /> 4. Flora <br /> A. The site is currently covered by small alder and various brush an <br /> shrubs. An attempt will be made to maintain stands of existing trees <br /> although the majority will be cleared for development. Additional <br /> species will be introduced for landscaping and screening to the front <br /> of the site. The northern undeveloped portion of the site will be <br /> maintained in its natural state. <br /> 7. Light a��are <br /> The proposed southern facade of the project is a potential source of <br /> glare from reflected sunlight. The proposed glass wall is non-reflective <br /> and broken into small units to reduce the potential for warping and <br /> resultant "hot spots." The 80 foot front yard and abundant landscaping, <br /> together with the relation to S. Broadway should serve to minimize impact <br /> of potential glare on drivers. Other facades have minimal glass and no <br /> assumed impact. <br /> �3. Transportation/Circulation <br /> A. TherP may be some additional vehicular activity directly adjacenene�ated <br /> the site, altYiough insignificant, proportional to the activity 9 <br />