Laserfiche WebLink
220e2 L-ORAIN ROAD <br />P4-10NE 26 - U )3 - 9554 <br />September 30, 2013 <br />Ms. Haley <br />Plans Examiner <br />Everett Public Works <br />FAIRVIEW PARK. OHIO 44126 <br />FAX 440 - 76 - 6937 <br />RE: Express Japan, TI <br />1402 SE Everett Mall Way, Food Court #623 <br />Review Number: B1309-012, M-1309-022, K1309-003 <br />Dear Ms. Haley: <br />In review of the Plan Review Letter, dated September 27, 2013, for the above referenced project, <br />LS Architects would like to respond as follows: <br />"'I. Door shall be an Eliason LWP-3 which complies, see revised drawing A-1. <br />-'2. Details have been revised to be non-combustible construction and a three in baffle has been <br />ladled see sheet A-2. <br />3.One hour fire wrap has been added to revised drawings see sheet M- I & A-2. <br />'4. Elevation has been provided 1/A-2, the is provided as a nonabsorbent and noncombustible <br />material. <br />5. Hood extends 6" beyond the edge of the top horizontal surface of all appliances, see <br />dimensions on drawing A-1. <br />A. No cleanouts required, exhaust duct shall run straight up though roof. <br />7. Notes have been added to drawings. <br />a. Duct material and size was noted on M-I plan. <br />b. Notation has been added. <br />c. Grease duct is supported by hood collar and hood''/z" threaded rod to unistruct at all four <br />corners. <br />Suppression <br />I. Cut sheet of chemical agent is attached. <br />2. Specific nozzle layout and dimensions for the equipment has been provided on revised <br />drawing M-2. <br />If you have any questions and/or concerns, please contact me at 216-403-9654. <br />Sincerely, <br />LS Architects <br />Leon S. Sampat, Architect <br />