My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 SE EVERETT MALL WAY 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
304
>
304 SE EVERETT MALL WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2023 9:36:25 AM
Creation date
2/13/2017 8:12:46 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
304
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />You may appeal this determination to the City Clerk at City A,11, 3002 'Wetmore <br />Avenue no later than 15 days from the date the DNS becomes final by submittin; <br />a written statement requesting an appeal which sets forth tl:a nx.me and address <br />of the person aggrieved and a clear and concise statement of the grounds for <br />the appeal. You should be prepared to make specific factual objections. <br />Contact Bob Landles to read or ask about the procedures for SEPA appeals. <br />NOTE: This Final DNS may be withdrawn in the event of significant changes in <br />the proposal, disclosure of new significant information, <br />misrepresentation by the applicant, or failure to comply with the <br />conditions upon which this Determination of Non -Significance is <br />predicated. <br />INFORMATION FOR DEVELOPER: <br />1. Detailed drawings in accordance with City Design and Construction <br />Standards shall be submitted to the Public Works Department showing <br />site parking layout, landscaping, utilities, storm drainage, temporary <br />construction erosion control, and all required improvements in ;;he <br />public right-of-way. Public Works Department approval of these <br />drawings is required prior to any permits being issued. All <br />improvements shall be completed, approved, and warranted before the <br />Occupancy Permit is issued. <br />2. City streets and alleys are to be kept clear of dirt and debris at all <br />times during construction. Dust suppression and street cleaning must <br />occur as directed by the Public Works Inspector. <br />3. Permits are required for destination of fill within the Everett City <br />limits. <br />4. A two-year guarantee is required for private retention/detention cr <br />other drainage treatment/abatement facilities serving areas larger than <br />one acre. <br />5. A new SEPA review will be required for any development on the vacant <br />portion of the site designated as "Building/Parking Pad For Future <br />Development." During this new review we will also look at the <br />functioning of the development proposed in the current application and <br />its relationship to the proposed new development. The City may place <br />additional requirements on the auto center at that time. <br />A hydrauli^ project approval would be required from the State <br />Department of Fisheries or Game for any stream side stormwater outfall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.