My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 SE EVERETT MALL WAY 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
304
>
304 SE EVERETT MALL WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2023 9:36:25 AM
Creation date
2/13/2017 8:12:46 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
304
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED (2) <br />ON OF NON -SIGNIFICANCE <br />SEPA #31-86 <br />This Determination of Non -Significance shall expire one year from <br />the date of issuance final unless a completed building permit <br />application has been submitted within that time. A request for a <br />one-year extension of this Determination of Non -Significance may <br />be made to the Planning Director prior to the expiration date. <br />DFSCRIPTION OF PROPOSAL: The proposed action is the issuance of Building and <br />Public Works permits to allow the construction of an approximately 46,489 <br />square foot center for auto related retail uses, auto repair and service, tire <br />manufacturing/retread, a gas station with two 12,000 gallon tanks and a car <br />wash on a 4.44 acre site. A portion of the site was previously constructed. <br />The project is now being revised to include uses that were not previously <br />proposed including a gas station, car wash and a service station. <br />PROPONENT: Finley Architects, AIA, PS <br />1812 Hewitt Avenue <br />Everett, WA 98206 <br />LOCATION OF PROPOSAL: Southeast corner of Everett Mall Way and 3rd Ave. S.E. <br />Lead Agency: City of Everett Planning Dept. <br />Contact Person: Mary Cunningham Phone: 259-8731 <br />Mitigation Measures: <br />The environmental impacts of this proposal are documented in the Environmental <br />Checklist and other information on file with the City. The listed <br />requirements are placed in response to our review of this information: (New <br />conditions are shown with an 0.) <br />AGENCIES WITH JURISDICTION <br />01. A Notice of Construction must be obtained from the Puget Sound Air <br />Pollution Coptrol Agency for the installation of the underground tanks <br />prior to the issuance of any permits. <br />MITIGATION OF ADVERSE IMPACTS BY SEPA <br />1. Screening of all outdoor refuse disposal areas must be provided „($ AD <br />Aesthetics Policy) p (lad Lr�S U <br />J'JN 20987 <br />987 <br />............... ...._. <br />I.Ty 0F EVERETT <br />pub!1c Works Dept. <br />
The URL can be used to link to this page
Your browser does not support the video tag.