My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
312 SE EVERETT MALL WAY 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
312
>
312 SE EVERETT MALL WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 1:09:44 PM
Creation date
2/13/2017 8:19:07 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
312
Notes
AUTO MALL CAR WASH
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
You may appeal this determination to the City Clerk at City Hall, 3002 'detwore <br />Avenue no later than 15 days from the date the DNS becomes final by submitting <br />a written statement requesting an appeal which sets forth the name and address <br />of the person aggrieved and a clear and concise statement of the grounds for <br />the appeal. You should be prepared to make specific factual objections. <br />Contact Bob Landles to read or ask about the procedures for SEPA appeals. <br />NOTE: This Final DNS may be withdrawn in the event of significant changes in <br />the proposal, disclosure of new significant information, <br />misrepresentation by the applicant, or failure to comply with the <br />conditions upon which this Determination of Non -Significance is <br />predicated. <br />INFORMATION FOR DEVELOPER: <br />1. Detailed drawings in accordance with City Design and Construction <br />Standards shall be submitted to the Public Works Department showing <br />site parking layout, landscaping, utilities, storm drainage, temporary <br />construction erosion control, and all required improvements in the <br />public right. -of -way. Public Works Department approval of these <br />drawings is required prior to any permits being issued. All <br />improvements shall be completed, approved, and warranted before the <br />Occupancy Permit is issued. <br />2. City streets and alleys are to be kept clear of dirt and debris at all <br />times during construction. Dust suppression and street cleaning must <br />occur as directed by the Public Works Inspector. <br />3. Permits are required for destination of fill within the Everett City <br />limits. <br />4. A two-year guarantee is required for private retention/detention or <br />other drainage treatment/abatement facilities serving areas larger than <br />one acre. <br />5. A new SEPA review will be required for any development on the vacant <br />portion of the situ designated as "Building/Parking Pad For Future <br />Development." During this new review we will also look at the <br />functioning of the development proposed in the current application and <br />its relationship to the propo,�%td new development. The City may place <br />additional requirements on the auto center at that time. <br />A hydraulic project approval would be required from the State <br />Department of Fisheries or Game for any stream side stormuater outlall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.