Laserfiche WebLink
EMOI' IV PROIECT <br />]N:31-3101 <br />MEETING WITH CITY UF EVEREIT PAGE 2 <br />14. The city uses liquid chlorine for testing the pipes ro the meters. A 3 inch water <br />meter will not be accepted. It must be e�ther a 2 mch or 4 inch meter. Nothing <br />can be physically connected until it is tested and purified. <br />15. Bill Bmce (259-8800) is the contact person for specifications on fire standards. <br />He is in charge of all backFlow and inspection. <br />16. Deduct meters are not allowed, so the 1 1/2 inch deduct merer will have to be <br />eliminated. <br />17. The city will relocate the fire hydrants and install the check valve. The transfer <br />will be by Sound U:ilities. <br />18. Power conduit runs over the city easements will have ro be fiber optic encased. <br />19. Washington Wrecking did not get the sewer Iine capped and inspected. R& L <br />will contact Jce Anderson ro expedite this work. <br />20. Gordon Witcher of the Ci[y of Everett approved having the gravel put down at <br />the temporary lot and the uology blor`-� put azound the ]ot edge, and wheel <br />stops placed. We will coordinate with Gordon for any additional requirements <br />on Thursday. <br />WWR:ss <br />cc: Attendees <br />File <br />121MII01/J 104mtglhis <br />