My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/07/13 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/07/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 9:24:16 AM
Creation date
2/13/2017 9:23:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The budget development for Tasks 610 through 699 below assumes a limited Consultant involvement <br /> through 18 months of working-day construction period. Additional engineering services required beyond <br /> this period or in addition to the allocated labor hours stated herein will be conducted in accordance with this <br /> Change Order Number 1. <br /> Page 3 <br /> P:\24945 Everett WPCI-\710 Project Management\01 Contract Docs\Change Order Number 1-CM\Exhibit A-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.