My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/07/13 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/07/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 9:24:16 AM
Creation date
2/13/2017 9:23:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 610_ Submittal Review <br /> Objective. To insure that the facilities proposed by the Contractor will fulfill the requirements of the <br /> contract. <br /> Approach. Unless otherwise transmitted electronically,one reproducible original plus four copies of a <br /> complete submittal package will be received by the Consultant from the Construction Manager. The <br /> Consultant will receive and review complete submittals for contract compliance and return comments to the <br /> Construction Manager within 21 calendar days. In order to maintain within the budget allocated for this task, <br /> it is imperative that complete submittals be provided;the Consultant reserves the right to return incomplete <br /> submittal packages to the Construction Manager without review of content. A complete submittal package <br /> will include all of the information listed in the contract documents with single unit responsibility (e.g.a <br /> particular piece of equipment or system)which may include materials,shop drawings,wiring diagrams,design <br /> and performance criteria,calculations,mitigation plans,outage plans,and product data. <br /> The Consultant shall assemble two separate submittal lists and deliver these lists to the Construction <br /> Manager. One submittal list will show each Project Manual submittal that requires review,comment,and <br /> approval by the Engineer. The second submittal list will show allsubmittals that are considered product data <br /> and are for information purposes only. One copy of each list shall also be transmitted to the City. <br /> A normal part of submittal review herein includes some minor effort in reviewing submittals that deviate <br /> from the contract documents. Excessive review of Contractor proposals for alternate equipment and <br /> materials,equipment proposals not in compliance with the specifications,and cost savings proposals by the <br /> Contractor is to be at the Contractor's expense. Otherwise,this additional work shall be in accordance with <br /> the Agreement. <br /> Product. The Consultant will return comments for each submittal to the Construction Manager. The <br /> consultant will maintain a submittal log reflecting only the submittals that the Construction Manager has <br /> chosen to give to the Consultant for review. The Construction Manager is expected to maintain the official <br /> project submittal log for all submittals. The Consultant shall submit one list of contract submittals that <br /> require review and comment and one list of contract submittals that are considered product data. <br /> City Responsibilities. The City shall review all submittals that require the Engineer's approval upon receipt <br /> from the Consultant. The City shall inform the Consultant in writing of any specific comments that the City <br /> wants incorporated into the submittal mark-up within 7 calendar days upon receipt from the Consultant. <br /> Page 4 <br /> P:\24945 Everett WPCF\710 Project Management\01 Contract Docs\Change Order Number 1-CM\ExhibitA-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.