My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/07/13 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/07/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 9:24:16 AM
Creation date
2/13/2017 9:23:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Task 620. Change Order Preparation <br /> Objective. Change orders may be required to address actual conditions encountered in the field, to <br /> accommodate additional items to improve the project, and incorporate Contractor recommendations that <br /> could save contract costs. <br /> Approach. The Consultant will work with the Construction Manager to identify the reasons for change <br /> orders and schedule impacts. It is assumed that the Construction Manager will prepare monthly pay <br /> estimates and prepare and negotiate change orders. The Consultant will provide drawings and specifications <br /> for changes associated with design errors or omissions. The budget allocated for this task assumes a limited <br /> labor effort,as shown in Exhibit B,and is based on preparing change orders only for design issues related to <br /> the Scope of Work items. The Consultant will provide documentation of Consultant hours spent resolving <br /> out-of-scope issues or non-design related change orders. Additional change order preparation assistance will <br /> be conducted in accordance with the Agreement as additional out-of-scope work, for non-design related <br /> change orders and for change orders for additional facilities not included in this Scope of Work. <br /> Product. Drawings, Specifications, and engineering labor and other charges associated with change orders <br /> will be provided. <br /> Page 5 <br /> P:\24945 Everett IVPCF\710 Project Management\01 Contract Docs\Change Order Number 1-CM\ExhibitA-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 14 <br />