My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/07/13 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/07/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 9:24:16 AM
Creation date
2/13/2017 9:23:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 640. General On-Site Field Services <br /> Objective. To support the GC/CM Contractor and the City by attending on-site meetings and conducting <br /> miscellaneous field inspection services during construction. <br /> Approach. The Consultant will attend field meetings and perform miscellaneous inspection services as <br /> requested by the City and GC/CM Contractor. The Consultant will attend a preconstruction conference also <br /> attended by staff from the City, the GC/CM Contractor, and the Subcontractors. The purpose of the <br /> preconstruction conference is to clarify authority and relationships, partnering schedule submittals, <br /> procedures for pay requests,equipment and materials submittals,change order procedures,and project close- <br /> out procedures. The Consultant will also attend weekly progress meetings and perform special field <br /> inspections at the request of the City and Construction Manager. <br /> Products. There are no specific products identified for this task. The budget allocated for this task assumes <br /> one engineer attends the preconstruction conference, 78 weekly progress meetings,plus an additional 12 site <br /> visits for special field inspections of 8 hours duration each. <br /> Page 7 <br /> P:\24945 Everett WPCF\710 Project Management\01 Contract Docs\Change Order Number 1-CM\Exhibit A-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.