Laserfiche WebLink
4 <br /> Task 680. As-Built Documentation <br /> Objective. To provide as-built documentation for the Phase A EWPCF Project. <br /> Approach. The construction drawing sets for the Phase A EWPCF Project will be updated by the <br /> Construction Contractor to reflect the as-built facilities. These documents will be transmitted to the <br /> Consultant immediately after construction. The Consultant will incorporate the as-built information and <br /> create an electronic set of master as-builts for the project. <br /> Activities/Products. The Consultant will assemble a set of as-built drawings for the Phase A EWPCF <br /> Project. Products for this task include submission of one complete and reproducible full-size drawing set <br /> for the as-built facilities,and an electronic copy of the as-built drawings. <br /> • <br /> Page 12 <br /> P:\24945 Everett WPCF\710 Project Management\01 Contract Docs\Change Order Number 1-C1VAExhibitA-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 1 <br />