My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/07/13 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/07/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 9:24:16 AM
Creation date
2/13/2017 9:23:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Task 680. As-Built Documentation <br /> Objective. To provide as-built documentation for the Phase A EWPCF Project. <br /> Approach. The construction drawing sets for the Phase A EWPCF Project will be updated by the <br /> Construction Contractor to reflect the as-built facilities. These documents will be transmitted to the <br /> Consultant immediately after construction. The Consultant will incorporate the as-built information and <br /> create an electronic set of master as-builts for the project. <br /> Activities/Products. The Consultant will assemble a set of as-built drawings for the Phase A EWPCF <br /> Project. Products for this task include submission of one complete and reproducible full-size drawing set <br /> for the as-built facilities,and an electronic copy of the as-built drawings. <br /> • <br /> Page 12 <br /> P:\24945 Everett WPCF\710 Project Management\01 Contract Docs\Change Order Number 1-C1VAExhibitA-Scope of <br /> Work Change Order 1 CM ver 1.doc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.