My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/08/10 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/08/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 10:14:08 AM
Creation date
2/15/2017 10:10:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1.4.1 Maintain,monitor, update, and revise the CPM Project Schedule. The <br /> CPM Project Schedule will be maintained,monitored, updated, and revised <br /> • on a monthly basis to reflect actual prosecution and progress of the project <br /> compared to planned <br /> • as needed to reflect a change in project scope, schedule,budget,or contract <br /> duration as approved by COE. <br /> Adjust the duration, predecessor and successor relationships, constraints, linkages, <br /> activity descriptions and dates, milestones, and critical path, to reflect the current <br /> status of the project and the revisions made to the work breakdown structure. <br /> Task 1.5 Monthly Progress Reports <br /> Deliverables <br /> • Monthly progress reports <br /> Prepare and submit a monthly progress report. The progress report is due by the 10th <br /> of every month in electronic format. A hard copy of the report is due with each <br /> invoice. The monthly progress report will include, but is not limited to: <br /> a) a narrative report that identifies and describes significant activities performed <br /> in the previous month and for the next month. Identify all deliverables <br /> completed during the reporting period, accomplishments, important meetings, <br /> and current open issues relating to the work. Report on activities related to <br /> M/W/DBE and small businesses participating in project. Include information <br /> supporting the monthly update of the CPM Project Schedule such as variance <br /> analysis, trend analysis, potential impacts, schedule contingency status, and <br /> measures for mitigating schedule slippage. <br /> b) an updated CPM Project Schedule that accurately reflects the status of the <br /> work. <br /> c) a graph showing planned hours compared to actual hours using the time- <br /> phased resource projection prepared as part of the approved Work Plan. <br /> d) an earned value report showing expenditures to date compared to the time- <br /> phased cash flow projection prepared as part of the approved Work Plan. <br /> e) an updated Contract Scope Change Log of proposed,pending, approved <br /> changes, and potential changes to the final, negotiated, scope of services for <br /> this contract. Provide the following data for each entry on the Contract Scope <br /> Change log: <br /> • Background: A description of events leading to the change and objectives <br /> to be accomplished with the change. <br /> • Detailed Scope of Work: A detailed description of activities required to <br /> 8 reach the objective provided as revisions (in strike-through, underline <br /> format) to the final, negotiated, scope of services. <br /> 30%SCOPE OF SERVICES, PAGE 9 OF 16 <br /> North Everett Transit Station <br /> July 29,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.