• <br /> Grand Avenue Park Bridge Construction Management and Construction Support <br /> City of Everett Scope of Work <br /> Exhibit A <br /> a. Review construction contractor's schedules weekly for compliance with Contract <br /> Documents. <br /> b. Monitor the construction contractor's conformance to schedule and require revised <br /> schedules when needed. Advise Owner and Client of schedule changes. <br /> 4. Progress Meetings. Lead weekly progress meetings with the construction contractor, <br /> including Client pre-briefing. Prepare weekly meeting agenda and meeting notes, and <br /> distribute copies to attendees. Track outstanding issues on a weekly basis. Some meetings <br /> may be rescheduled or cancelled due to holidays or other reasons. Consultant will notify <br /> effected parties at least one week in advance, when possible. <br /> 5. Manage Submittal Process. Track and review, or cause to be reviewed by other appropriate <br /> party, work plans, shop drawings, samples, test reports, and other data submitted by the <br /> construction contractor, for general conformance to the Contract Documents. <br /> 6. The Consultant Project Engineer will accept material in accordance with Chapter 9 of the <br /> WSDOT Construction Manual. <br /> 7. Record of Materials. The Consultant shall perform and document all Material Approval and <br /> Acceptance. Review all materials sent for construction for compliance with the specifications, <br /> and sign the necessary transmittals. Provide Record of Materials indicating anticipated <br /> material approvals, the bid Item and specification reference, material compliance <br /> documentation including manufacturers/fabricator's Certificates of Compliance, applicable <br /> Qualified Products List(QPL) codes, other fabrication inspection documentation, visual <br /> inspections, rebar order cut sheets and materials testing requirements. Maintain records of <br /> material compliance documentation received and advise of any known deficiencies. <br /> a. The Consultant will maintain and make use of the most current WSDOT QPL. Client <br /> recommends using the WSDOT Transmittal of Manufacturer's Certificate of Compliance <br /> — Form 350-572 (or similar but equivalent form). <br /> b. As part of the Records of Materials the Consultant will confirm and document <br /> conformance to federal and State "Buy America" provisions, per the project General <br /> Special Provisions. This provision relates to all products that contain steel or iron and are <br /> to be permanently incorporated into the project. <br /> c. The Consultant will confirm that the steel fabrication inspection program is set-up and <br /> confirm the inspector has the required AISC training per 6-03.3 in the Standard Spec. If <br /> the WSDOT Material lab is performing the inspection, the Consultant will confirm they are <br /> properly notified and scheduled for the necessary inspections. <br /> 8. Prepare weekly statement of working days and distribute to the Owner, Client, and <br /> Contractor. <br /> 9. Manage RFI (Request for Information) process. Track and review/evaluate, or cause to be <br /> reviewed/evaluated by other appropriate party, RFIs. Manage responses to RFIs. <br /> 10. Change Management. Evaluate entitlement, and prepare scope, impact, and independent <br /> estimate for change orders. Facilitate resolution of change orders. It is understood that the <br /> owner will prepare the actual change order document. <br /> 11. Monthly Pay Requests. Prepare monthly bid item quantity requests for payment and/or <br /> review payment requests submitted by the construction contractor. Review with Owner, <br /> Client and construction contractor, and recommend approval, as appropriate. <br /> 12. Evaluate construction contractor's Schedule of Values for lump sum items. Review the <br /> Contract Price allocations and verify that such allocations are made in accordance with the <br /> requirements of the Contract Documents. <br /> 13. Prevailing Wage Monitoring: <br /> kpff 7of15 <br />