My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/10/05 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/10/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 9:11:21 AM
Creation date
2/17/2017 9:10:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'S S� <br /> J <br /> RESOLUTION NO. <br /> A RESOLUTION Authorizing the Snohomish County PUD <br /> To File or Cause to be Filed on the City of Everett's behalf with the <br /> Federal Energy Regulatory Commission an Application for <br /> Non-Capacity Related License Amendment to Remove a Certain <br /> Transmission Line From the Jackson Hydroelectric Project License <br /> WHEREAS, construction of the Jackson Hydroelectric Project(the "Project") included, <br /> among other things, a switchyard adjacent to the Powerhouse and a single-circuit 115 kV <br /> transmission line(the"South Line") connecting the switchyard with the Sultan <br /> Substation and other portions of the PUD's"Jackson Loop"; and <br /> WHEREAS, as a result of transmission system improvements in the east county area <br /> involving the Jackson Loop,the South Line is now an element of single-circuit 115 kV <br /> transmission lines that, among other things,move power from or around the Project, <br /> including power from the Bonneville Power Administration or Puget Sound Power and <br /> Light Company, in order to improve area system reliability and adjust to changing loads; <br /> and <br /> WHEREAS, the"South Line"is no longer a "primary line" for the Project as defined in <br /> 16 U.S.C. § 796(11) since it is not used solely for transmission of power from the Project, <br /> but is instead a segment of the larger Jackson Loop. Under applicable law, only"primary <br /> lines" for a project require licensing, and as a result the entire 3.79 mile length of the <br /> South Line should be removed from the Project License, <br /> NOW,THEREFORE, BE RESOLVED BY THE Everett City Council as follows: <br /> 1. The Snohomish County PUD is hereby authorized to sign and file with the <br /> Federal Energy Regulatory Commission on the City of Everett's behalf a cover <br /> letter and"Application for Amendment of License to Delete Certain Non- <br /> Jurisdictional Transmission Facilities From License,"substantially in the form <br /> attached hereto as Exhibits A and B,respectively. Such documents are <br /> incorporated herein by this reference. <br /> Councilmember Introducing Resolution <br /> PASSED AND APPROVED this day of October, 2005. <br /> Council President <br /> it) <br />
The URL can be used to link to this page
Your browser does not support the video tag.