My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2521 LOMBARD AVE 2016-01-01 MF Import
>
Address Records
>
LOMBARD AVE
>
2521
>
2521 LOMBARD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 6:31:17 PM
Creation date
2/17/2017 6:30:45 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2521
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not increase traffic on-site. No traffic mitigation plan was required. The City <br /> reserved the right to require a traffic siudy if the Applicant adds a day care facility <br /> or school function io the church. (exhibit , page 2J <br /> 8. Currenily on-site are 50 parking stalls. While the expansion would eliminate <br /> some of the sialls, lhe Applicant proposed to add six new parking stalls directly <br /> off the ailey. Pursuant to EMC 19.34.020 Table No. 34-1, a minimum of one <br /> parking stall must be provided for every five seats in the church. According io <br /> the Applicant, there are approximately 442 linear feet of pews within the chapel <br /> area of the church. Ai least 44 parking stalls are required. The Applicant <br /> praposes 56 stalls after :he expansion. Adequate off-street parking is available. <br /> (exhibif 1) <br /> 9. The subjeci property is located in an R-4, Multiple-Family I-ligh Density zone. As <br /> noted, the property has long been developed wiih the ApplicanYs church facility. <br /> The expansion wouid incorporate the existiny archilectural elements of the <br /> existing structure. It would not exceed ihe allowable height of 80 feet and would <br /> satisfy all setbacks. It is being designed to be compatible in size and scale with <br /> the existing church structure. Landscaping along ihe northern �roperty line <br /> between the church parking facility and the residences to ihe north would be <br /> enhanced. (exhibit 1, page 3) <br /> 10. No signage is proposed for the facility. (exhibit 1, page 3) <br /> 11. According to the Ciiy, the site has what appears to be adequate landscaping <br /> along ihe southern and western property lines, but additional landscaping �vould <br /> be required on the northern property line adjacent to the resideniial structure. <br /> The north property landscaping would mitigate potential parking lot nuisances to <br /> ihe properties adjacent to it. The landscaping plan must be reviewed and <br /> approved by the Planning Department prior to final permit approval. (exhibit 1, <br /> page 4) <br /> 12. Construction would generate some nuisance irritants such as noise, smoke, <br /> dust, odor, glare, visual blight and other undesirable impacts. These, however, <br /> are temporary and would not be preseni when the project is completed. There is <br /> no long term nuisance irritants expected from the proposed development. <br /> (exhibit 1, page 4) <br /> 13. The expansion is consistent with the Goais and Policies of ihe Everett General <br /> Comprehensive Plan. (exhibif 1, page 4) <br /> 14. Pursuant to ihe Siate Environmental Pc�licy Act (SEPA1, the City of Everett was <br /> designated as the lead agency for review of environmental impacts from the <br /> proposed development. On October 1, 2004, the City issued a Final Mitigated <br /> Determination of Non-Significant (MDNS). Conditions were imposed which the <br /> 1 4 '`�� <br /> � �; <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.