My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 INDUSTRY ST 2018-01-01 MF Import
>
Address Records
>
INDUSTRY ST
>
1500
>
1500 INDUSTRY ST 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:14:09 AM
Creation date
2/19/2017 9:02:04 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1500
Notes
BUILDING SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> The City of Everett Flanning and Communiry llevelopment Director has determined thar. <br /> • 7'he project is located within the boundaries of the Southwest Everett Subarea Plan. <br /> • The zoning designation of the properh�upon which the project is proposed is consistent witn those <br /> designations analyzed ir,the Southwest Everett/Paine Field Subarea Plan and EIS, December 199G. <br /> • The proposed use is consistent with the uses and intensities allowed in the City's development <br /> regulations and is iisted as a use analyzed in the final EIS, Tables 3.]-1 and 3.1?• <br /> • The project is a use that implements the Subarea Plan 1nd the projecPs significant environmental <br /> impacts have been adequately addressed in the SW Everett/Paine Field Subarea Plan EIS. <br /> • The projecPs significant adverse environmental impacts will be mitigated through the application of , <br /> the mitigation decision document. These mitigation measures,along with other Cit}�requirements and � <br /> conditions,constitute sufficient mitigation for the significant environmental impacts associated with <br /> the proposed project. <br /> • The proposed project must comply with all applicable locai, state and federal regulations and <br /> development standards. <br /> . The proposed project is not an essential public facility. <br /> The project proponent has agreed to comply with the SW Everett Subarea Plan Mitigation Decision <br /> Document. Thc project is hcreby designated a Planned Action pursuant to RCW 43.21C.031(�)(a)and <br /> City of Everett Ordinance No.2213-97. A SEPA threshold detertnination is not required for this <br /> proposal per 43.21C.031 RCW. This derermination is dependent upon cornpliance wiQ�the SW E��erett <br /> Subarea Plan Mitigation Decision Duc��ment and all local, state,and fede�al regulations related to general <br /> environmental proter.tion including,but not limited to, rieht-o}=way improvement requirements, drainage, <br /> etc. This decision was made after review of a completed environmental checklist and other information <br /> on file with the lead agency. <br /> There is no public comment period provided for this determina[ion for[he division of th�37 acros into <br /> eight(8)lou and a storm drainage tract,and construction of eight(8)manufacturing, warehouse and <br /> office bu�ldings containing a total of about 607,000 square feet of gross building area or construction of <br /> [he new east-west roadway that was addressed in the previous SEPA analysis(MDNS 99-035). <br /> The lead agency for[his proposal has detertnined thlt provision of 5,000 gallon per minute fire flow <br /> capaciry does not have a probable significant adverse impact on the em�ironment. An Environmental <br /> impact Statement is rot required under RC�1'43�1 C.03C(2)(c). This determination assumes compliaece <br /> with State law and City ordinances related to peneral environmental protection including but not limiteo <br /> to right-of-way improvement requirements,drainage, etc. This decision was made aker review of a <br /> completed environmental checklist and other information on file with thc lead agency. This information <br /> is available to the public on request. This Mitigated Detertnination ofNon-Significance is specifically <br /> conditioned on compliance with the conditions attached hereto which are incorporated by reference as if <br /> fully set forth herein. <br /> A 14-day public comment period on the SEPA threshold determination on tiie proposed provi�ion of a fire <br /> flow capac�ty of 5,000 guilons per minute ended on July 19,2002. No comments�vere received. <br /> Responsib[e <br /> O!'ticial: Paul A. Roberts <br /> Title: Planning and Community Development Director <br /> Address: 2930 Wetmore Avenue, Suite 8-A, Fverett,\VA 98201 <br /> Datc: July 24, 2002 <br /> Si�naturc: <br /> �Ia i <br />
The URL can be used to link to this page
Your browser does not support the video tag.