Laserfiche WebLink
There is no sdministrative appeal provided for this Planned Action Determination. Tnere is an appeal <br /> period on the SEPA threshold determination. for ld days fror,the above da[e. <br /> You may appeal Ihe SEPA determination cn Ilie proposed �,OCO callon per minute 6re flow by filing an <br /> appeal on forms provided by the Planning Department and a fee to the Planning/Communiry Development <br /> Permit Services Counter at 3200 Cedar Street,Znd Floor. <br /> Contact Gary Doughty to read or ask about the;�rocedures ior SEPA apoeals. <br /> NOTE: This Planned Action Determination or SEPA Threshold Determination may be withdrawn <br /> in the event of significant changes in the proposal, disclosure of new significant <br /> information, misrepresentation by t;�e applicant, or failure to comph�with the existing <br /> rcgulations or the conditions in the Mitiga?ion Decision Document. <br /> INFORMATION FOR DEVELOPER: <br /> The following information is provided for the developer's benefit. These are not SGPA conditions. All <br /> requiremenu are preliminary in nature,and are based upon the preliminary site plan and the ordinances in <br /> effect at time of submittal for SEPA review. The proposal must comply with all ordinances in effect <br /> at the time a complete building permit application is filed,including those not specifically set forth <br /> herein. (Exception: For vesting under the Zoning Code,please refer to Section 44 of the Zoning Code). <br /> Contact the Plannin�;Depsrtment for information regarding appeals processes for the requirements listed <br /> in this document. <br /> AGENCIES WITH,IURISBICTION: None <br /> APPLICABLE CONDITIONS FROM SW EVERETT MITIGATION DECISIOi!' DOCUMENT <br /> Section 1: LAND USE <br /> 1.1 Thresholds <br /> 1.3 Mitigation Measures <br /> 1. Historic and Culmral Preservation. If any archaeological resources or human remains are found <br /> during construction,Ihe project proponent shall contac[the Tulalip Tribes, the City of Everett <br /> Planring and Community Development Department, and the State Office of Archaeology and Historic <br /> Preservation. This contact will initiate a consultation process for determining subsequent actions. <br /> (SEPA Land and Shoreline Use Policies) <br /> Section 2: TRANSPORTATION <br /> 2.1 Thresl�old <br /> Any development that exceeds 30 peak hour trips per net developable acre must complete additiunal <br /> traffic analysis.(This is 2 times the average PM peak hour trips per acre projected.) Net developable <br /> acres is the area of the site minus em�ironmentally sensitive areas. <br /> ('oCl <br />