My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 INDUSTRY ST 2018-01-01 MF Import
>
Address Records
>
INDUSTRY ST
>
1500
>
1500 INDUSTRY ST 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:14:09 AM
Creation date
2/19/2017 9:02:04 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1500
Notes
BUILDING SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. <br /> (v) Apnropriate Access to all Anticipated Uses: , <br /> Findin s: All of ihe ]ots will have fruntage on Hardeson Road, Merrill Creek Parkway and/or <br /> tne new easl-west street connecting liardeson Road with thc CSR Associated property located <br /> east of Lot 8. Access as shown on the site plan dated May 21, 2002, on file with the City of <br /> Everett Planning Department is generally acceptable to the City. Lots 8A, 8B, and 8C tivill take <br /> access from Merrill Creck Parkway. Development of any of Lots 8D dvough 8H �vill require <br /> construction of thc new east-west road tivough to Hardeson Road. <br /> Final binding sitc plan approval Cor any of the parcels adjoining thc ncw road will requirc <br /> construction of�ull road improvements plus an adequate fire tum-around from Hardeson Road to <br /> Aie eastemmost property line of the lot(s) being recorded. <br /> Condusions: All lots will have Gontage on a publicly dedicatcd slrect. <br /> (vi) Provision for All Appropriate Deeds, Dedications and/or Gasements: <br /> Findinas: Easements must be granted behvccn lots wher� necessary to convey stomiwatcr to <br /> storniwater facilities. <br /> Conclusions: Appropriate provisions must be provided for easements belween the lots. <br /> (vii) Examination of existine streets and utilities and how the nronosed bindin� site plan relates <br /> to them: <br /> Pindin�s: All of the oroposed lots would front on eithcr Hardeson Road, Merrill Creek Park�vay <br /> or the new east-wesi road proposed in ihis binding site plan. Sewer and water co�meclions r.uist <br /> be made to thc City's public mains. <br /> Conclusions: Adequate streets and utilities are available to the site and will be made available to <br /> the individual lots. <br /> 5. Environmental Issues - Examination of the project through ihe SEPA process and a <br /> determination of whether the proposed Binding Site Plan, site plan and other application <br /> inPormation complies with the city's SEPA Ordinance, zoning code and comprehensive plan <br /> policies. <br /> Findines: A Final Mit�gated Determination of Non-Significance and Planned Action <br /> Determination (NiDNS No. 02-026) was issucd on July 22, 2002 for the bindint;site plan, <br /> construction of the new road, and construction of seven buildings containing about 607,000 <br /> square fcet of office, industrial and warehouse space. The proposal is consistent with the SW <br /> Everett Subarea Plan. The proposed new roadway, and the clearing and grading of the site wcre <br /> addressed in MDNS No. 99-035. The proposal must comply with all applicable conditions of the <br /> S1� Everett Subarea Plan Mitigation Decision Document, the Zoning Code, the Seaway Center <br /> Master Plan and Master Landscaping Plan, and all oQier local, state and federal regulations. <br /> Conclusions: All State Environmental Policy Act requirements and zonin�provisions related to <br /> environmental protection have been met. <br /> 4i <br />
The URL can be used to link to this page
Your browser does not support the video tag.