Laserfiche WebLink
.�_ �,�Yus AU��St 20, �Qyz o i� � � � � � <br /> ��A�I� City of Everett Public Works � �� � <br /> 3200 Cedar Street AUG 2 1 1S... <br /> V(/A(_;i�!ER Everett, wA �s2oi <br /> C I i .' " 'c„[ ."TT <br /> ,A h C II I 1 L (� l 5 Uld li.n,.l� C�.,nl2t <br /> Attention: Jeffrey S. McI'all �• <br /> RE: Nardone - Everet[ <br /> �I i3�yl�s.nin JOB NO.: 91-1220 <br /> is��;,�, [3r�nd,�in Subject: Reply to Permit Review Comments - Project No. 37190 <br /> Richard L. N3gner, AIA <br /> ri,�,�».,s in-e.�r.. nin Dear JefFrey: <br /> The following responses are in reply to your letter of Augus[ 7, 1992. Corrections <br /> on drawings ace indicated as Revision #2. <br /> Associate <br /> �" i,,_ s,,r11n (1) Note revision of occupancy [o Ri on Sheet O1. <br /> (2) Note elimination of note pertaining to 9th unit from Shee[s A2 and El. <br /> (3) Note that floor/ceiling assembly to have (2) layers of 5/8" Type "X" G.W.B. <br /> with 1/2" plywood (min) above for a 1-hour assembly per Gypsuc�: Association <br /> File No. FC 5906. <br /> (4) Note revised dimension at Bath 903 which will provide a minimum of 2'-6" <br /> in front of toilet. (Toilet is 2'-2-1/2" from finish wall to lip.) <br /> (5) Attic access as indicated provides approxima[ely 34" of clear headroom. See <br /> additional note on upper level floor plan for Contractor to verify minimum <br /> 30" of clear headroom. <br /> (6) See additional note on Wall Section A, Shee[ A2, and addition of roof jacks <br /> on east and west elevations. Area required = 7.7 sq.f[. (1108 sq.in.). Bird <br /> blocking will provide 967 sq.in. along with (10) roof jacics at 50 sq.in., each, <br /> for a total of 1967 sq.in. p�ovided. <br /> (7) Note that stair assembly is to be cons[ructed with che same assembly listed <br /> in reply (3) (FC5906). <br /> (8) Per Section 3306(j), Gxception 1, only one handrail is required on stairs less <br /> than 44" in width and serving one individual dwelling uniC in Group R-1 <br /> occupancies. Main entry stair to have handrail cn each side. See revised <br /> eleva[ions Sheets A1 and A2. <br /> (9) See reply (8)• See revised elevaCiuns, Sheets A1-A2. <br /> (10) See smoke detector at �op landing sho�vn on upper level electrical mechanical <br /> plan Sheet EI. See added note Sheet G1 calling for smoke detector at <br /> basement level. <br /> (11) Sce added noCe Sheet A1 requiring operable storm windows at egress <br /> windo��s. <br /> vso nz n�e. n.r. <br /> s�,���� is� <br /> acllc�vr.���:���nnai <br /> Fan: (.'.OG) 453-11013 <br /> (201i1dS4-USf,� PI-A�AVING :AItIIIIII.C.II�HI IA'ILHIUHS <br />•�� <br />