Laserfiche WebLink
!. <br /> chemical or biological materials in any landfili. The fill will be done in a <br /> manner that will not be detrimental to any properties or water. (Finding <br /> 15) <br /> 9. Road improvements to 19th Avenue SE (SR-527) and Lake Heights <br /> Drive will be done in a manner to reduce or mitigate any impacts as a <br /> result of the proposed project. The Applicant agreed to a mifigation fee <br /> of$200 per foot for the frontage on 19th Avenue SE (SR-527) and haif- <br /> street improvements w�ll be made !o l.ake Heiyhts Drive. (Finding 16) <br /> 10. There are no archaeological or historical sites that are readily apparent <br /> on-s�te. Any discovery of such sites during construction will be <br /> immediately reported to the City. (Finding 17) <br /> 11. 7he increased height of the atrium portion of the building to 33 feet is <br /> reasonabls. It provides additional daylight, solar heating `o the site and <br /> does not impact any other properties with casting shado�,vs or any other <br /> detriments to those properties. (Finding 19) <br /> 12. Landscaping on-site is required. The Applica�it is to retain an old, large <br /> cedar tre�, if it is determined by a licensed arborist that it is not a safety <br /> hazard. If the tree is to be removed, notice should be given to the City <br /> so that a determination of what alternative is ava�lable as a result of the <br /> loss of the tree can be made. (Findings 22, <^•3, 25J <br /> 13. During construction, measures sFoulrJ be taken to protect any wetlands <br /> on-site or any roots of significant vegetation. These reguletions should <br /> be explained to contractors and should be clearly marked. <br /> DECISION <br /> Based upon the preceding findings of facts and cenclusions, testimony and <br /> evidence submitted at the public hearing, and upon the imprsssions of the <br /> Hearing Examiner at a site view, it is hereby ordered tl�e Shoreline <br /> Management Substantial Development Permit is gr�r.�ad to allow the <br /> c�nstruction of a 52 bed assisted living facility subject to the conditions list�d <br /> below. In addition, the Review Process II is granted to allow the atrium port'on <br /> of the building to exceed the 28 foot height limitation established for this zone <br /> to 33 feet. <br /> 1. All utility lines must be installed underground. <br /> 9 <br /> � <br />