Laserfiche WebLink
, <br /> % •i SEC710N 1-05, CONTROL OF WORK <br /> , I 2 Jur�e 8, 1H98 <br /> i <br /> 3 1-05.3 Plans ¢+nd Workin� Drawings i <br /> � 4 lhe following sentence is inserted after the first sentonce of the third paragraph: ` <br /> 5 I <br /> 6 Except as noted, all drawings and other submirials shall be delivered directly to i <br /> 7 the R�iect Engineer. <br /> I 8 <br /> 9 The following senterce is inserted after the fourth sentence of the third paragraph: � <br /> 10 � <br /> ( 11 � After a plan or dr�wing has been approved and retumed to the Contractor, all i <br /> 12 changes tt�at the C�ntractor proposes sha11 be suhmihed to the Project Engineer <br /> 13 for review and approval. <br /> I 14 <br /> 15 1-05.4 �onformity With and Deviations From Plaes aitd �takes <br /> 16 The fifth parags'aph is revised to read: <br /> I 17 <br /> 18 'i'he Cor�tractor shall work to preserve stakes, marks, r.�nd monuments. The <br /> � 19 Contra�ting agency will deduct fron payments due the Contractor, all co�ts to <br /> e 2p ;tp!?re takes, marks, and monuments careless�y or willfully dama5ed or <br /> � 21 destruyad by ii ic Gnntractor's ope�af'on. <br /> 22 <br /> � 23 1-05.!0 G�uarantees <br /> 24 This section is revised to read: <br /> 25 <br /> I 2g The Contractor shall fumish to the Contracting Age�icy any guarantee or <br /> 27 warranty fumished as a nortnal trade practice in conner,tion with the purchase <br /> 28 of any equipment, materials, or items incorporated into the projec;. <br /> I <br /> � <br /> ENGLISH AMENCIMENTS DIVISION 1 05.AP1 � <br /> IJUNE 8, 199& Page 1 <br />