Laserfiche WebLink
i <br /> 1 To qualify for continued listing on the QPL, praiucts may be sampled and tested <br /> 2 for confortnance to the Standard Specifications. The Confracting Agency <br /> 3 reserves the right to make revisions to the QPL at any time. <br /> 4 <br /> I5 If thf.ro is a conflict between the QPL and the contract, the provisions of the <br /> � 6 contrz:t stiall take preceden� over the QPL. <br /> 7 <br /> I 8 1-06.9(2) Reque.si for Approval of Material (RAM) <br /> � 3 The RAM shall b�� �sed wher. the Contractor elects not to use the QPL or the <br /> 10 material is nut list= 1 in the QPL. The RAM shall be prepared by the Contractnr <br /> � 11 in accordance with ths instructions on ihe form (DOT 350-0711 and submittec� to <br />� 12 the F_ngineer fur a,�proval bafore the material is incorporated into the work. <br /> 13 <br /> I 14 A�proval oi the maieria' does not constitute acceptance of the material for <br /> ! "15 incorporation into the wor�:. <br /> 16 <br /> ( 17 Additirms! acceptance actions as noted on the RAM neec± to b2 cur�ipi2ted prior <br /> ( 18 to thc materials be�ng i.n.c��orated inio the work. <br /> 19 <br /> � 20 N;hen requesting approval of an item that requires fabrication, botfi the <br /> 21 �abricator and the manui�,cturer of the base material shall be identified on the <br /> 22 RAM. <br /> R 23 <br /> � 24 1-06.2(1) Samrles and Tests for Acceptance <br /> 25 The third subparagraph under Other Publications is moved and inserted after the <br /> I 26 third paragraph. <br /> I 2� <br /> 28 1-06.3 Manra��cturer's Certificate of Compliance <br /> i 29 The secand paragraph is revised to read: <br /> 30 <br /> 31 The Contractor may request, in writing, authority frorn the Engineer to install <br /> 32 sijch materials prior to submitting the required certification; however, no <br /> 33 payment will be made for the work in the absence of an acceptable <br /> 34 Manufacturers Certificate of Compliance. The Con9ractiny Agency reserves the <br /> 35 right to deny the request tor good cause. If for a�y reason the Contractor has <br /> �, 36 not provided an acceptable Ma�ufacturer's Cenificate of Compliance by the <br /> 37 physical completion date established by Section 1-08.5, tlie Contracting Agenoy <br /> 38 will assess the usefulness of the installed material. At the Engineers discretion, <br /> 39 the Contracting Agency will either require replacement of the material by the <br /> 40 Contractor at no expense to the Contracting Agency or process the final <br /> 41 payment as provided by Section 1-09.9 without paying for the materials or any <br /> 42 portion of the work perfortned io install the materials provided on such a basis. <br /> 43 The unit contract prices for the work shafl be used to determine the amount to <br /> 44 be withheld. Where unit contract prices do not exist, as �n a lump sum item, the <br /> 45 amount to be withheld shall be an equitablc adjustment, covering labor, <br /> I 46 equipment and materials, detertnined i;i accord��ce with Section 1-09A. <br /> I <br /> I ENGLISH AMENDMENTS DIVISION 1 05.AP1 - <br /> FEBRUARY 17, 1998 Page 2 <br />