All excavations in roadway areas shall be backfilled and patched with temporary asphalt at the end of each <br /> workciay �nless permission is granted to do othenvise by the Engineer. All temporary patches shall be <br /> permanently patched wi[hin Iwo weeks of completion of work within Ihe roadway area. Where unsuitable <br /> material is encountered,as deterniined by the Engineer, where settlement of subgrade has occurred,the unsuitable <br /> material shall be reanoved and the c�cavation shall be backfilled with Quarry S��alls or Gravel Borrow,as directed <br /> by the Engineer,and theroughly compacted. <br /> Care shall be taken to avoid damage to existing sprinkler systems and/or landscaped areas. Damage ro sprinkler <br /> systems shall be repaired with the appropriate equipment and left operable. Final payment to the Contractor shall <br /> be withheld until the systems are repaired to the owner's satisfaction and landscaping restored. <br /> SECTION 8-20.3(5) OF THE SiANDARD SPECIFICATIONS IS SUPPLEMENTED RY TH� <br /> ITOLLONING: <br /> 8-20.3(5) Conduit <br /> I One-eighth inch diame�er nyion pull cords or approved equal shall be installed with all conduits. The pull <br /> cords shall be tied off at both ends. Payment for the pull cords shall be incidental to the conduit pay item. <br /> Puil cords shall have a minimum pull strength of 200 pounds. <br /> I SECTION 8-20.3(8) OF THE STANDARD SPECIFICATIONS IS SUPPLENiENTED BY THE <br /> FOLLOWING: <br /> I8-20.3(8) Wiring <br /> Add the following: <br /> ' Lugs connecting signal wiring to equipment terminals on terminal strips shall be insulated. Lugs connecting <br /> loop detector lea�!-ia wiring shall be uninsulated and soldered ro the wire. <br /> I SECTION 8-20.3(10) OF TAE STANPARD SPECIFICATIONS IS SUPPLEMENTED BY TNE <br /> FOLLO W ING: <br /> I5-20.3(10) Service <br /> A) Risers on Snohomish Counry PUD 1Jo. 1 Poles or City owned poles: The Contractor shall be responsible <br /> to install conduit risers on Snohomish County PUD No. 1 or City owned poles as necessary for electrical <br /> service connections. Conduit risers shall be constructed in accordance with Everett Standard Plun No. <br /> 820. Thc bottom 10' of the riser shall be galvanized steel or Schedule 80 PVC and the remaining portion <br /> shall be Schedu�e 40 PVC or Schedule 80 PVC. The riser shall be installed on a standoff with 4" <br /> i minimum clearance between the conduit and the pole. A weather head is required and shal) be located S" <br /> � below the secondary power lines. <br /> I D) Service Connections: The Contractor shall obtain a City of Everett Electrical Pertnit from the Building <br /> Department at no cost. When the service is ready to be hooked u�, lhe contractor shall contac[ the <br /> Building Department to request an electricai inspection, After the service has becn approved for hook up, <br /> the City shall contact the Snohamish County PUD No. 1 and they will make the service connections ro the <br /> I power suppiy at a cest io be paid by the City. The Contracror shall notify the city of the work schedule as <br /> soon as pessible so their wodc can be coordinated with the contractors work. <br /> I <br /> I <br /> p�.V�cwx W1CN�SOD_,p[c�Cmtpav.doc <br /> Uavid fvans;u�d Associatcs,Inc. SP-9 7�h Ava SP11001�5L Signal Modifcetion <br /> Ilunc 1998 <br />