Laserfiche WebLink
i <br /> T.4BLE I: INSULATION THICKNESS,TEST VOLTAGE <br /> AND WSUL.ATION RESISTANCE <br /> Conductar Insulation Insulation Resistance at 60°F <br /> Size AWG Thickness In. Test Megohms/1000 k � <br /> Volta c 4 <br /> , 19 0.25 2,500 25,000 j <br /> TABLE II: [DENTIFYING COLORS AND SEQUENCE � <br /> Pair No. TIP Rin Pair No. 'I'IP Rin <br /> i <br /> ; � White Rlue 14 I�lack Arown <br /> 2 White Oran e 15 Black Slate <br /> 3 Vb'hite Gre•n 16 Yellow Blue <br /> 4 White Brown 17 Yellow Oran e � <br /> 5 White Slate 18 Yellow Green � <br /> � 6 Red_ Blue 19 Yellow Brown � <br /> 7 Red Oran e 20 Yellow Slate � <br /> Ig Red Green 21 Violet Blue <br /> 9 Red Brown 22 Violet Oran e � <br /> � 10 Red Sla[e 23 Violet Green <br /> �� Black Bluc 24 Violet E3�own <br /> I �2 dlack Oran e 25 Vielet Slate <br /> 13 Black Green <br /> I [nterconnect Cable [nstallation: Care shall be taken to prevent damage to Uie cable setting up pulling apparatus or <br /> in placing tocls or hardware. Cablr,s shall not be stepped upon when entering or leaving the junction boxcs and <br /> cable tcrmination cabinets. <br /> Cable reels which are delivered io tl�e work locations and are not set up immediately for placing operations shall <br /> � bc securely blocked or secured to a substautial support structure to prevent rolling. <br /> The Contractor shall verify distances behveen cable termination cabinets prior to �ulling any precut cable to <br /> ensure adequate cable lengths. No cables shall be spliced be[ween the cable termination points shown in the <br /> Iplans. <br /> Reels shall be rolled i�i the direction indicated by the arrows painted on the reel flanges by tlie manufacturer. <br /> I Cable reels shall be set up on the same side of the cable termination point as the :onduit section in which the <br /> cable is to be placed. The reel shall be leveled and brought into proper alignment with ihe condvit ser,tions so that <br /> the cable pays off Gcm the top of the reel in a long smoo�h bend into the duct withoui twisting. Unde: no <br /> I circumstances shall the cable be payed oft�Gom the bottom of a reel. Each reel of cable shall �e equipped with <br /> the cable manufacturer's factory installed pulling-in cyes. Onc hundred percent(100%)of the conduciers shall bc <br /> attached to the pulling-in eye. Eield-cut cable ends siiall be provided with a .voven (basket)cable grip. A swivci <br /> I with a minimum of 3.4" (1.9 cm) links shall be used be[ween the pulling-in eycs or cable grip and the pulling <br /> slrand. � <br /> p:Wcw00NVN�]��c�Can4wovdnc <br /> David Evans m�d Associatcs,Ina SP-IS 7th Ava SCJIOOULR�Signnl ModiGcation <br /> � Juncl998 <br /> I <br />