Laserfiche WebLink
Cable placed in conduit shall be pulled without interruption using nylon cable ai:�ched to a power winch All <br /> equipment shali be carefully ciiecked to ensure that it is proverly set up prior to beginnir¢ the pulling operation, <br /> in order to minimize inteiruption once pulling has started. The cable shall be pulled at the rate of 15 fcet per <br /> minutc or less. <br /> I Careful anention shall be paid ro warnings from observers as the: cable is bein�; pulled so that pulling may be <br /> stopped quickly whenever necessary to avoid damage to the cablc. <br /> If for any reason the pulling �operation is halted behveen juncti�n boxes, the winch operator shall release the <br /> I tension on the winch unless directed to do so by the Gngineer. In restarting the pulling operation,the inertia of the <br /> cablc should be overcome by gradually increasing the tension in steps a few seconds apart until the cable once <br /> again is in mction. <br /> Cable pulliag shall be stopped i�mr,cdiately if ihe cable on a rer,l binds or does not pay off freely. The cause of <br /> the binding must be cleared to the saSisfaction of the Eng�neer bcfo:e the pull-in oEieration is continued. The cable <br /> rcel shall tum freely or the cable can�he fed by har�d so that thr,re is no tension on ehe cable as it enters the conduit <br /> � system. <br /> I <br /> A cable fceder guide of suitable dimensions shall be used beh+�een the r.able rec!and the face of the duct to protect <br /> I the cable and guide it into the Juc[ as ii is paycd off the reel. The cable shall q,oi !�e bent at any location to a <br /> radius less than i 0 times the cable outside diameter. <br /> I The mechanical stress piaced upon a csble during installation shall not be such that the cable is :wisted or <br /> stretched. The d:rection in which the cable is to be pulled s!iall be provided by the Engincer. <br /> As the cable is payed off the reel, it shall be carefully inspected fe�jac};et defects. If de;ucts are noticed, thc <br /> I pu'Iing operation shall be stopped immediat��ly and the Lngineer will determine what correctivc action shall be <br /> taken. The pay-off reel shall be monitored to,:nsure that'the cable is not under tension as it is pa,ved off the reel. <br /> I As the cables are peyed off the reel into the cable feeder guide, they shall be sufficienlly lubricated with a type of <br /> �ubricant recommended by the cable manufacdwer and approved by the Cngineer. A cable lubricator (funnel) <br /> shall be placed around the cable just ahead of thc cable feeder ro facilitate �roper lubrication of the cable. <br /> I On caole runs which involve one or more interned4ate janction boxes, the c�blc shall be routed a:ound an <br /> intermediate power assist or wheel. The dinmeter of t.his d+:vice shall not bc less than 24". An intem�ediate power <br /> ass�st shall bc used at any junction box where tha fa:ce needed to pull the cable to the next junction box or cablc <br /> I rennination cabinet woulC othenvise exceed the ma:ciizium allowable pulling tension for the cable involved. 1'he <br /> catde shall make 1 S turns around asy intermediate power assist. Sleck cable pulled out at intermediete junction <br /> boxes shall be restricted to the minimum amount necessary for routing around the particular rotary device and <br /> � back into the next conduit section. Cable shall ��iot be laid on tti: ground. C.ure shall bc taken to avoid the <br /> accumulation of dirt or other debris on the lubricatr.d cable. <br /> Thc operator of the intcrtnediate powcr assist shall careTully coordinatc its operaticn wiQi thot of the powcr winch <br /> + to ensure that the cable entering the down-line cenduit run is not imder tension. <br /> � <br /> After the cable has bcen placed, the exposed cable in the junction boxes and cabinets shall be wiped cl.ean of cai:le <br /> Ilubricant with a cloth. <br /> Su�cient cable, plus 28" �i'I1CfM bendi�g radius pertnils, should be left in each cabinet to prcrperly tertninate the <br /> I cables. All �uiled ends should b� examined for evid.nce of damage due to the pul�ing operation. The cabic <br /> sheath should not be pulleJ beyond the cable care. Additionally, 6' of slack cat�le shall be IeR in each <br /> intcrtncdiate junction box. <br /> I , <br /> i <br /> ,,:w�.,.�ooe.wvao_.���ro.o..a« j <br /> David 8vans arid Associatcs,Inc. SP-16 71h Ava S�/109��1.Signal Modification � <br /> Iluncl998 � <br /> � <br /> j <br />