�or aerial installation of Ihe mainline cable, the ^ontractor shall be responsible for sizing thc proper harciware for <br /> installing the cable (i.e., suspension clamps, dead-end, etcJ. The acrial cable shall be installed with 18' ground <br /> i clearance zt all locations. The cable shall be at least 12" clear of any other utility cables on the poles. Where the <br /> cable will not meet the 12" minimum clearance, an optio�al "stand off' stainless steel or galvanized mounting <br /> bracket will be used. Cable must be nominally 40" below PUD service neutral wire. <br /> IWhen pulling the cable in conduit, the cable pulling equipment must demonstrate that the total force on the cable <br /> • does not exceed 50% of the ac�epted, published, and manufacmrer's mcommendations for each cable. Pulling <br /> through junction boxes will be allowed with proper guides or pulleys. Caution shall be observed by the <br /> � Contracror while pulling the cables through conduits to prevent damage to cable jackets, shields,cr conduits. All <br /> cable ends shall be taped ro exclude moisture during installation, and shall be kept taped until connections arc <br /> made with terniinal strips. The sock used for pulling cables shall be as recommended by the cable mannfacturer <br /> � and as approved by the Engineer. <br /> All splicing of the cable wnducto�s for overhead installation shall be allowed only in "ready access" closures. <br /> The Contractor shall order and install the cables in such lengths as to ensure conformance to this Specification. <br /> � See "Aerial Junction Boxes(Ready Access Closures)",this section. <br /> When cable is installed above existing utility communication cables(i.c., cable, TV), the sag shall be the same as <br /> I those below it. Where this cable is the only communications cable to span between any two poles, the sag shall <br /> be approximately I% to 2% of the span length. ]n all spans, the Contractor shall verify in the presence of the <br /> Engineer that the cable tension is less than the maximum allowed by the cable manufacturer. The Contractor shall <br /> I Frovide the Engineer�++ith data from the cable manufacmrer that sets the maximum allowable tension and span. <br /> The Contractor shall provide a 6' loop of the cable within the controller cabinet. The City will make thc <br /> connections of the interconnect caUle to t�ie controllcrs after the intcrconnect cable has been completely installed <br /> Iand tested by the Contractor. <br /> If construction and installation of the telemetry system is not paid for on a lump sum basis, measurement and <br /> i payment for cable installation will be as follows: <br /> Paymcnt: Measu:ecnent for payment will be by the actual length of cable installed, as measured by the <br /> t'ootage markings on the cable. <br /> Payment will be made for the following bid items as are included in the proposal and payment will be madc <br /> under. <br /> 1) _pair REA PE-39 filled cable installed in existing conduits, per linear foot. <br /> 2) _pair R�A PE-38 filled cable inslalled on existing utility poles,per linear foot. <br /> , The unit contract price(s) for the pay item(s) enumerated shall be fuil compensation for furnishing all materials, <br /> labor, tools, and equipment necessary for lhe fulfillment of s;! the requi�cments of Ihese Specifications in lhe <br /> execution of the work shown in the plarts or as required by the Gngince�. <br /> 5-20.6(2) Tcrminal and Splicc Enclosures <br /> All cable splicing locations shall be enclosed i�i one of the following: <br /> A. Aerial Junction Boxcs (Ready Access Closures): Aerial Junction boxec shall conform to Standar�i Plan <br /> No. 81 I. For overhead interconnect, acrial junction boxes wili be used to enclose tertninal and splicing <br /> locations. Aerial junction boxes shall only be located at poles. In cases where the terminal end of cable <br /> is located at some distance behveeii poles, the cable shall be cut back to the nearest pole and the <br /> junction box loca[ed at ihis pole. <br /> p:4Vcw�00MUYSPI_spec4ron9�v.doe <br /> David Lvans and i+ssociatcs,Ina SP-17 7ih Ava SFlI00t�SL Signal Malification <br /> IJm�o�998 <br />