Laserfiche WebLink
treatment of storm water will protect Puget Sound and the Snohomish River, which do provide habitat <br /> for fish species. <br /> Mitigatton Measures <br /> No additionai mitigation is required. <br /> Section 11: GEOIOGY <br /> The project will be required to comply with International Buiiding Codes and City of Everett Public Works <br /> >tandards. <br /> Mitigation Measures <br /> No additional mitigation is required. <br /> Section 12: ENVIRONMENTAL HEALTH <br /> There are a number of state,federel and local requirements that are identified in the Planned Action <br /> ordinance to ensure potential environmental health risks are adequately mitigated. <br /> Mitigation Measures <br /> No additional mitigation is required. <br /> Section 13: WATER QUALITY <br /> Storm water from this property is treated at the City's waste water treatment plant. <br /> Mitigation Measures <br /> No additional mitigation is required. <br /> ' Sectio�14: AESTHETICS <br /> Once demolition work is completed,the site shall comply with the general aesthetic standards for the B- <br /> 3 zone and those specific to the Historic Resources(refer to Section S0,above). <br /> MitigaHon Measures <br /> Please refer to conditions listed in Section 30,above. <br /> 6� � <br />