Laserfiche WebLink
..�� y <br /> 35. Building far,ade modulation and roofline variation must be provided per the Historic Overlay Zoning <br /> Standards. The maximum wall length without modulation on the east side of the building must be no <br /> greater than 30 feet. The motline must have a slope a minimum of 6:12 vertical to horizontal ratio. <br /> 36. The Washington State Clean Air Act requires the use of all known, available,and nasonable means <br /> of controlling air poll�tion, including dust. Dust generated during construction activities can be <br /> controlled by wetting those tiust sources such as:�*eas of exposed soils,washing truck wheels before <br /> they leave the site,and installing and maintaining gravel conshuction entrances, Construction vehicle <br /> track-out is also a major dust source. My evidence of track-out can trigger violations and fines from <br /> the Department of Ecology or the Puget Sound Air Pollution Control Agency. <br /> 37. Each building must have a walkway connection to the public sidewalk on Grand Avenue. <br /> GENERAL INFORMATION <br /> 1. The mail box location and type must be approved by the USPS. The Historic District Guidelines <br /> state that grouped mailboxes shall not be located within the front setback on the site. Mailboxes <br /> should always be integrated into the entryway of all multi-family projects, to provide accessibility and <br /> visibiliry to residents and postal carriers. <br /> 2. The Snohomish County PUD currently has sufficient capacity to provide electrical power to this <br /> proposed development. For further infortnation about the electrical service requirements for this <br /> project,please call the DistricYs Gverett Office at 425-258-8272 to contact a Customer Engineer. <br />„ <br /> /d' <br />