My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2508 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
2508
>
2508 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 9:26:29 AM
Creation date
2/20/2017 7:27:08 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2508
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />5. The size of the hot water heater required is based on the number of bathrooms and bedrooms <br />provided in the �tructure. For a 2 bathroom/8 bedroom strudure, l"able 5-1 of the Uniform <br />Plumbing Code requires an 80 gallon, first hour rating wzter heater. <br />6. Each Flight of stairs tliat has 4 or more risers is required to have a handrail (one side of U�e <br />stairs). <br />a. Handrails should be located between 3438 inches above the tread nosings. <br />b. Handrail grip-size should be in accordance with Section R311.7.73 <br />c. Handrail ends should be returned or tem�inated in newel posts. <br />If you have any further questions I may be reached at (425) 257-8812. <br />Sincerely, <br />Tony Lee <br />Building Official <br />Ciry of Everett <br />
The URL can be used to link to this page
Your browser does not support the video tag.