Laserfiche WebLink
A. ComFrehensive Plan - The proposed Binding Site Plan, site plan and other application information <br />proposed for development shall be consistent with the City's Comprehensive Plan policies and land use <br />map; <br />Finding: The Everett Comprehensive Pian desianates this area as 5.4 – Office and Industrial Park. <br />The application states the lots will be used in a manner consistent with the uses identified in the <br />Planned Action Ordinance for the Southwest EveretUPaine Field Subarea Plan. These uses are <br />also consistent with the Comprehensive Plan. <br />Conclusion: The proposed binding site pla� and anticipated land uses are consistent with the <br />Comprehensive Plan. <br />B. Zoning – The proposed binding site plan, site plan and other required application information shall <br />meet the requirements of the Everett Zoning Code, except as permitted by the design and development <br />provisions of (Title 18); <br />Finding: a) M-1 Zoning Standards: The existing zoning of this Binding Site Plan is M-1, Office <br />and Industrial Park, with Planned Development Overlay (PDO). The M-1 zone requires a minimum <br />lot area of 5 acres, with provision to allow lots as small as 2 acres. However, the Planned <br />Development Overlay and Development Agreement is document governing redeve:�pment of the <br />Rink�r PropeRy. In the case of the lots within the Glenwood and Hardeson retail nodes, minimurr <br />lot size is one acre. The F� �posed lots range in size from 1.80 acres (Lot 2) to 5.0 acres (Lot 5). <br />Minimum lot width and depth is 150 feet. The proposed lots meet minimum width and depth <br />standardsforthe M-lzone. <br />The instant application includes a proposed development plan for Lot 1 of the BSP. Building A <br />would have 7,880 square feet of retail space; Building B would have 6,455 square feet of retail <br />space and Building C would be a 4,848 square foot restaurant with drive-up H�indow. The proposed <br />restaurant with drive-up window is prohibited under current zoning regulations (Footnote 16.c—Use <br />Standards Table of Zoning Code). The City and Applicant are working joinlly on revisions to the <br />Development Agreement dated March 28, 2000. The agreement would allow reslaurants with drive- <br />up windows, and would also waive the requirement for building perimeter landscaping for lots within <br />the retail nodes. <br />Conclusion: The lots can provide adequate buildiny, parking and yard areas and meet all M-1 <br />zoning standards and the amended PDO. This document must be approved by the Everett City <br />Council prior to the issuance of any construction permits on Lot 1. The amended PDO will be <br />torwarded for approval by the Everett City Council shortly. <br />C. Natural Environment - The Binding Site Plan, site plan and other required application information <br />shall meet the requirements of Environmentally Sensitive Area Regulations of the Everelt Zoning Code, <br />Title 20, Everett Municipal Code (Environmental Policies), and the State Environmental Policy Act, <br />WAC 197.11; <br />Findings: The site has had significant clearing, grading and fill activity as a result of past and <br />current gravel mining aclivities. No significant vegetation or environmentally sensitive areas exist on <br />the site. <br />Conclusion: The Ap{�licant's proposal does not impact the natural environment. Due to the <br />presence of fill materi;il on this site, a condition should be placed on the final Binding Site Plan map <br />requiring the preraral�on of a soils report prior to issuance of any construction permits for any lot. <br />D. Public Services - The proposed project shall be designed to meet the following: <br />1) Adequafe �vatersupply to City Standards: <br />,a <br />