|
Washington State Department of Transportation Page 3 Six Year Transportation Improvement Program
<br /> Agency Everett From 2003 to 2008
<br /> County No. 31 Hearing Date 6/26/02
<br /> City No. 420 Adoption Date 6/26/02
<br /> MPO PSRC Resolution No.
<br /> Project Identification ! 1 Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. 1 Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. I Federal Funding ! Local Agency
<br /> C. Project Title R/W
<br /> D. StreeVCounty Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or road merit Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number) F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code I Phase Code Funds Funds Funds (2003) (2004) (2005) 6th Type (MM/YY)
<br /> 1 2 • 3 4 5 6 7 8 9 10 11 • 12 13 14 15 16 ' 17 18 19 20 21
<br /> 14 4 IHP-1998(021) 4 phases in project 4 S,P 1.5 C PE 1 9/1/02 DEMO 732' 468 1,200 500' 700 EA
<br /> P RW 1 11/1/03 DEMO 592 2,008 2,600 240, 2,360. Yes
<br /> !East Marine View Drive Improvements T CN 7/1/04 DEMO 3,576 FMSIB 600' 4,0241 8,200 � 5,195 3,005
<br /> i East Marine View Drive O I
<br /> 11/1/03
<br /> North Broadway to Interstate 5
<br /> ;Design,construct roadway widening and improvements Totals 4,900' 6001 6,500, 12,000 7401 3,060 5,195 3,005
<br /> 14 5 2 phases in project 3 S 0.2 C PE 10/1/00 I i TIA i 45' 221 67 451
<br /> P CN 5/1/03 4551 2281 683 683 No
<br /> Broadway/Beverly Blvd.Intersection Improv. T
<br /> i'So.Broadway, Beverly Boulevard 0
<br /> I Broadway at Beverly to SR 526 ii �
<br /> !Design and construct intersection improvements Totals 500' 250 750 728
<br /> 14 6 1 3 phases in Project 31 P 0 PE . 2/1/06 3,600 3,600 3,600 No
<br /> RW 2/1/07 1,000 1,000 1,000
<br /> I Broadway Corridor Improvements iCN 6/1/08 20,400, 20,400 20,400
<br /> South Broadway Corridor i
<br /> SR 526 to 41st Street
<br /> i Widen to 5lanes with bike lanes 8 sidewalks I Totals 1 I 25,000 25,000 25,000
<br /> 14 7 2 phases in project 12 I S 00 C PE 5/1/01 i STP(S) 60 I 60 CE
<br /> I I i P CN 3/1/03 STP(S) 340 I 340 170 170 No
<br /> I(HES)Projects(Everett Mall Way,Broadway,Colby) T I , ,
<br /> Everett Mall Way 0
<br /> Everett Malt Way,Broadway,Colby , I
<br /> Various safety,signal related improvements Totals 1 400 400 1701 1701
<br /> 14 1 8 2 phases in Project I 6 S ! 3.6 I C PE I 4/1/01 265 75 340 100 1401 50 CE
<br /> P CN 6/1/02 CMAQ 216 2,044 2,260 2,260 No
<br /> Evergreen Way/SR 99 HOV Improvements I T '
<br /> Evergreen Way,SR 99 0 I i
<br /> Madison Street to Airport Road ! I I '
<br /> Install HOV treatments at key intersections ! Totals 481 2,119 2,600 100 1401 50 2260
<br /> 14 9 3 phases in ProjectI 1 P 5 C PE 12/1/91
<br /> P RW 1 9/1/95 Yes
<br /> SR 525 Corridor Projects ' ' T CN 1 8/1/991 35,000 35,000 10,000 25,000' EIS
<br /> SR 525 Corridor Projects 0 1
<br /> SR 526 to 1-5 Sep-95
<br /> Roadway improvements,new interchange at SR 99 Totals ; 35,000 35,000 10,000 25,000. f
<br /> 14 10 1 phase in Project 31 P 1 0 PE 2/1/04 400 100 500 , 5001
<br /> No
<br /> ,Arterial Needs Studies
<br /> ' I Various Arterials within City Limits 1
<br /> I 1N/A to N/A I I '
<br /> F
<br /> 'Study improvement needs-various classes of arterials , 1 Totals 400 100 I 500 500
<br />
|