Laserfiche WebLink
Washington State Department of Transportation Page 4 Six Year Transportation Improvement Program <br /> Agency Everett From 2003 to 2008 <br /> County No. 31 Hearing Date 6/26/02 <br /> City No. 420 Adoption Date 6/26/02 <br /> MPO PSRC Resolution No. <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> D. Street/County Road Name or Number Improve-1 I Phase 1 Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment I Total Utility Project Start I Fund Cost by 1 Fund State Local I Total 1st 2nd 3rd thru Envir. Date <br /> Class I Number F. Describe Work to be Done Type Status Length Codes Phase I(mm/dd/yy)' Code Phase Code Funds Funds Funds (2003) (2004) (2005) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 . 19 20 I 21 <br /> 16 1 HP-1998(015) 3 phases in project 8 S 0.3 C PE ' 1/1/99 DEMO 1,718 I 668 2,386 500 <br /> P RW 9/30/99 DEMO I 1,800 1,800 EA <br /> 41st Street Overcrossing T CN 6/30/01 DISC 6,351 FMSIB 3,000 1,401i 10,752 8,6731 Yes <br /> 41st Street I 0 CN 6/30/01 STP(U) 1,157 1,157 <br /> Design and construct railway overcrossinq I W Totals 9,626 3,000 3,869 16,495 9,173 <br /> 16 2 2 phases in project 1 S,P I 1.1 S PE 9/1/01 1,000 1,000 1,000 <br /> P CN 6/1/03 FMSIB 4,300 2,000 6,300 3,300 3,000 EA No <br /> Lowell Neighborhood Bypass(new name) <br /> Lowell Neighborhood BypassI <br /> 41st Street to Lowell River Road <br /> .Construct new minor arterial street Totals 4,3001 3,000 7,300 1,000 3,300 3,000, <br /> 16 3 2 phases in project 4 ' S 0.5 C PE 2/1/00 . TIB 247 130 377 <br /> Joint project with County-(City lead) P CN 6/1/02 TIB 513'1 2,110 2623 2,6231 No <br /> 112th Street SW Improvements T <br /> r."-- 112th Street SW 0 <br /> 0 Airport Road to Evergreen Way(SR 99) S I <br /> Design,construct 5lane street with bike&ped improv. W Totals I 7601 2,240' 3000 2623 <br /> 16 4 3 phases in project 4 • S 1.1 C PE 6/1/96 525 7871 1312 <br /> Joint project with Sno.County-(county lead) P RW 1 1/1/971,408 2,1111 3,519 EIS Yes <br /> 1112th Street SW-SE Improvements T CN 5/1/01 TIA 2,011' 3,019 5,030 3,000; <br /> 1112th Street SW-SE 0 <br /> Evergreen Way(SR 99) to 3rd Avenue SE S ! <br /> Design,construct 5 lane street with bike 8 ped improv. W Totals 3944 5917 9861 3,0001 <br /> 16 5 3 phases in project 4 S 1 C PE 1 1/1/02 STP(U)'. 297 851; 852'1 2,000 1,200 800 <br /> I P RW 1 5/1/02 STP(U) 379 322' 530i 1,231 731 500' Yes <br /> 112th Street SE Improvements T CN 5/1/03 STP(U) 2,024 TIA • 5,0001 5,0001 14,340 8,214 3,871 2,255 <br /> 112th Street SE O <br /> 3rd Avenue SE to 19th Avenue SE(SR 527) S I <br /> I Design,construct 5lane street with bikes ped improv. I W Totals 1 2,700 7,7271 7,1441 17,571 10,145 5,171. 2,255 <br /> 16 6 • 3 phases in project 4 P 0.9 C PE 5/1/04 TIA 3601 120' 480 480 <br /> Joint project with Sno.County-(County Lead) I 1 P RW 9/1/04 ' 516 516 No <br /> 387', 129' <br /> 116th Street SE Improvements T CN 6/1/05 ' 2,0601 687': 2,747 2,7471 <br /> 116th Street SE S i <br /> ' SR 527 to 35th Avenue SEW 1 <br /> Design,construct Slane street with bike&ped improv. G Totals i ! 2,807 936 3,743 996 2,747, <br /> 16 7 2 phases in project 4 I P 1 C PE ' 2/1/04 TIA 1 252 84 336 336 2,2141 <br /> P CN I 6/1/05 1,6601 554 2,214 No <br /> 100th Street SW Improvements T ' ' i <br /> 100th Street SW 0 <br /> Airport Road to Evergreen Way 1 I <br /> Design,construct road widening 8 other improvements 'i I Totals! 1,912 638' 2,550 1 336, 2,214' <br />