My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5202
>
Resolutions
>
Resolution 5202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 9:22:45 AM
Creation date
2/21/2017 9:22:42 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5202
Date
6/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS, these I-5 investments already have been identified as critical investments for transportation <br /> lists the City of Everett has generated in tandem with Snohomish County and the Washington State <br /> Department of Transportation(WSDOT), including the "Unified List of Critical Projects"presented to the <br /> 2002 Legislature and the I-5 Snohomish Corridor Action Plan(I-5 SnoCAP);and <br /> WHEREAS, the City further compiled a list of other important projects on highway approaches, freight <br /> mobility projects,transit investments,and one local arterial project. <br /> NOW THEREFORE, be it resolved that the Everett Mayor and Everett City Council do hereby submit <br /> their list of key regional transportation policies and projects,as follows: <br /> Policies <br /> 1. Everett is the largest city and county seat in Snohomish County. The City is the employment hub <br /> of the county, and experiences the major vehicle and freight traffic from Boeing production <br /> headquarters for the 747,767,and 777 jet airliners located within the City's corporate limits. As <br /> a result of these factors, Everett segment of I-5 is the most traffic-congested area of the county. <br /> Any regional investment package should emphasize improvements along the section of I-5 within <br /> the City of Everett. <br /> 2. Any regional transportation package compiled for voter approval must incorporate principles of <br /> equity between the counties involved, as well as been jurisdictions within each participating <br /> county. The benefits received by Everett residents and taxpayers from a regional investment <br /> package in Snohomish County should be commensurate to the tax revenues they contribute to <br /> these investments <br /> Projects <br /> 1. The highest priority projects for the City in a regional transportation investment package are <br /> projects to relieve congestion and bottlenecks on I-5,particularly the I-5/41st Interchange, I-5/US- <br /> 2 downtown interchanges, and a planned I-5/100`Street interchange. A more complete list is in <br /> Attachment 1. <br /> 2. The City also has compiled projects in the areas of"approaches,"freight mobility,"non-HSS"and <br /> transit/Everett Transit that it puts forth as important regional investments. ese are further <br /> detailed in Attachment 1. <br /> /I / . <br /> Council Person Introducing Resolution <br /> PASSED AND APPROVED this 12tlxlay of June ,2002. <br /> Council President <br />
The URL can be used to link to this page
Your browser does not support the video tag.