My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1136 GRAND AVE A&B 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
1136
>
1136 GRAND AVE A&B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 4:38:22 PM
Creation date
2/21/2017 11:14:13 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1136
Unit
A&B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Apri123, 2007 <br /> Mr. Scott Anderson <br /> L&A Job No. 6A I 26 <br /> Page 8 <br /> Pill embankments placed over areac stecper than I S% grade should be structurally supported. <br /> 7�he ground ovcr which structural fill is to be placed should be prepared in accordance with <br /> recommendations in the Site Prcnaration and General Gradin� and Excavation Slopes sections of <br /> this report. Structural fill should be placcd in lifts no morc than ]0 inchcs thick in its loose state, <br /> with each lifl compacted to a minimum percentage of the maximum dry density determined by <br /> ASTM D1557 (Modified Proctor Method)as follows: <br /> Aoplication %of Maximwn Drv Density <br /> Within building pads of the building lots 95% <br /> Roadway/driveway subgrade 95% for top 3 fect and 90% below <br /> Rctaining wall backfill 90% <br /> Utility trench backfill 95% for top 4 feet and 90% below <br /> Building Foundations <br /> Com•entional footing foundations may bc uscd to support the proposed duplex building. The <br /> footing foundations should be constructed on or into undisturbed, very-dense, fresh till soils or <br /> on structural fill constructcd on these competent native basal soils. Water should not be allowed <br /> to accumulate in excavaled footing trenches. Disturbed soils in footing trenches should be <br /> completely removed do�ti�n to firm native soils prior to pouring concrete for the footings. <br /> If the abovc recommcndations ure tiillowed, our rccommendcd design criteria for footing <br /> foundations arc as follows: <br /> • Allo�vablc soil bcaring pressurc, including dcad and livc loads, should not be morc than <br /> 3,000 psf for footings poured on or into very-dense fresh till soils, and not more than <br /> LIU & ASSOC[ATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.