My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/12/28 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/12/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 2:26:05 PM
Creation date
2/21/2017 2:25:22 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/28/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GILLIG BUS PURCHASE <br /> 5 CHANGE ORDER <br /> Issue Decision Cost Impact Reason <br /> ISM engine Replace ISL engine with +3,042.00 Heavier, more durable engine. <br /> ISM engine per bus Consistent with majority of <br /> (per bid submittal) current fleet. Cost savings from <br /> standpoint of technician training, <br /> tools and parts inventory. (see <br /> Tools below) <br /> Starter Replace Nippondenso -150.00 Delco is consistent with current <br /> starter with Delco MT-42 per bus fleet, inventory and technician <br /> starter training. <br /> Emco Wheaton Add +523.00 Reduces fueling time (labor cost). <br /> fast fill per bus Cam type connection utilizes back <br /> pressure to shut off fueling to <br /> prevent over fill. Over filling <br /> results in diesel spills on street. <br /> Air dryer Provide Bendix AD9 in -750.00 Bendix is consistent with current <br /> place of Graham-White per bus fleet, inventory and technician <br /> QBA 15 training. <br /> Air conditioning Replace with Thermo- +588.00 Longer life, reduced M&O cost <br /> compressor King S-391 screw per bus and down time of vehicle. Screw <br /> compressor compressor much more reliable. <br /> Highly recommended by other <br /> agencies with A/C. <br /> Step well heater Add +225.00 Eliminates need to salt steps. <br /> per bus Salting steps results in corrosion <br /> of bus parts and potential failure <br /> of new wheelchair ramp system. <br /> Driver's vent Delete requirement -175.00 Climate control system eliminates <br /> per bus need for driver's vent. <br /> Additional Add box +279.00 Gillig's standard Operator's <br /> storage box per bus storage box is behind and above <br /> driver's seat. Not accessible to all <br /> Operators due to its height. <br /> Window style To be Atwood flush +1,850.00 Allows for better cleaning with <br /> mounted per bus City's current bus wash system. <br /> Improved customer visibility and <br /> bus styling. <br /> Tail lights To be 4" in lieu of 7" -102.00 4" lights are recessed into bus <br /> per bus body as opposed to flush mounted. <br /> Improves protection from water <br /> and damage. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.