My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/01/11 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/01/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 10:21:01 AM
Creation date
2/22/2017 10:20:43 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/11/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 5 <br /> Assumptions, City Responsibilities: <br /> 1. The City will take the lead in communicating with the construction contractor. <br /> 2. Assumed City will provide a single copy of complete and fully-coordinated construction markups for <br /> production of as-built plans. <br /> 3. City will provide the Contractor with two sets of contract documents "approved for construction". <br /> Task 10 — Unanticipated Tasks <br /> This task will include additional labor or expenses not specifically identified in the scope of work tasks <br /> defined above. Such work items will be implemented on a work-order basis and should be implemented <br /> with written authorization from the City prior to conducting the work. <br /> 22 <br /> Sewer System Replacement"H" Dec 16, 2005 <br /> Amendment 3, Scope of Services Page 13 550502(UP3206) <br />
The URL can be used to link to this page
Your browser does not support the video tag.