My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/03/22 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/03/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 11:46:53 AM
Creation date
2/22/2017 11:46:08 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/22/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> Engineering&Pub/ie services <br /> REQUEST FOR QUALIFICATIONS <br /> 41st Street/Broadway Local Arterial Improvements <br /> Notice is hereby given that"Statements of Qualifications"will be received by the City of <br /> Everett until 4:00 PM, Friday,April 21, 2006 for"Preliminary Engineering", "Design <br /> Engineering", and "Construction Engineering" services for local arterial improvements <br /> adjacent to the new Single Point Urban Interchange being constructed at I-5 and 40 Street. <br /> PROJECT DESCRIPTION <br /> The work to be performed by the consultant consists of preparing preliminary engineering, <br /> environmental review, design, PS&E,right-of-way, and possibly construction engineering <br /> services. The proposed improvements includes widening of 40 Street and the Broadway <br /> Connector to accommodate and optimize the effectiveness of the new I-5 /4l St street <br /> freeway interchange, and improvements to Broadway. The project is anticipated to include <br /> rechannelization, increasing capacity, improving intersection radii, increasing left-turn <br /> storage, traffic signal improvements,new traffic signals, illumination, retaining walls, <br /> landscaping, sidewalks and bicycle/pedestrian trail improvements. The major phases and <br /> features of the selected consultant's services are as follows: <br /> Scope Development: <br /> • Prepare a prioritized list of project options based on draft scope of work outline to <br /> be provided by the City, review of the I-5 /41St Street SPUI improvements currently <br /> being constructed, and review of City planning documents including our Six-year <br /> Transportation Improvement Plan and preliminary work done on a Broadway <br /> Corridor Improvements study from SR 526 to 37th Street. <br /> • Scope alternatives shall consider available funding and proposed project schedule to <br /> provide local arterial improvements associated with the I-5 /41St Street Interchange <br /> and to follow its construction in a coordinated and expeditious manner. <br /> • It is the desire of the City of Everett that, if possible, the project shall be scheduled <br /> for bid advertisement by the end of February 2007 for the summer 2007 construction <br /> season. Scope alternatives shall include project options that include what could be <br /> constructed in summer 2007 versus what could be constructed in summer 2008. <br /> Preliminary Engineering: <br /> • Preparation of Preliminary Engineering Report, which identifies design <br /> alternatives, including a recommended alternative. Design alternatives shall <br /> include what can be constructed in summer 2007 versus what can be constructed in <br /> summer 2008. <br /> Design Engineering: <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.