My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5067
>
Resolutions
>
Resolution 5067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 9:35:50 AM
Creation date
2/23/2017 9:35:23 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5067
Date
6/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 3 Six Year Transportation Improvement Program <br /> Agency Everett From 2002 to 2007 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title RNV <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy' Code Phase Code Funds Funds Funds (2002) (2003) (2004) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 6 2 phases in Project 6 S 3.6 C PE 4/1/01 75 75 CE <br /> P CN 6/1/02 CMAQ 481 481 481 No <br /> Evergreen Way/SR 99 HOV Improvements T <br /> Evergreen Way,SR 99 0 <br /> Madison Street to Airport Road <br /> Install HOV treatments at key intersections Totals 481 75 556 481 <br /> 14 7 2 phases in project 6 S 2.5 C PE 1/1/98 I <br /> P CN 8/1/02 420 137 557 557 No <br /> 19th Avenue SE(SR 527)HOV Treatments T <br /> 19th Avenue SE(SR 527) 0 <br /> El Capitan Way to 132nd Street SE <br /> Install HOV treatments at key intersections Totals 420 137 557 557 <br /> 14 8 2 phases in project 12 S 00 C PE 5/1/01 STP(S) 30 30 CE <br /> P CN 3/1/02 STP(S) 170 170 170 No <br /> Everett Mall Way Safety(HES)Projects T <br /> • <br /> Everett Mall Way 0 <br /> En.Mal Way,between 3rd Ave.SE and 7th Ave.SE <br /> Consbuot turning banter safety project Totals 200 200 170 <br /> 14 9 1 phase in Project 31 P 0 PE 2/1/03 500 125 625 625 No <br /> Broadway Corridor Study <br /> Broadway Corridor Study <br /> 41st Street to Beverly Boulevard <br /> Preliminary Urban Design Study and Environ.Review Totals 500 125 625 625 <br /> 14 10 1 phase in Project 31 P 0 PE 2/1/04 400 100 500 500 <br /> I No <br /> Arterial Needs Studies <br /> Various Arterials within City Limits <br /> N/A to N/A <br /> Study Improvement needs-vacous dosses of arterials Totals 400 100 500 500 <br /> 16 1 HP-1998(015) 3 phases in project 8 S 0.3 C PE 1/1/99 DEMO 1,718 668 2,386 500 500 <br /> P RW 9/30/99 DEMO 1,800 1,800 EA <br /> 41st Street Overcrossing T CN 6/30/01 DEMO 5,615 F.M. 3,000 2,101 10,716 8,673 Yes <br /> 41st Street 0 CN 6/30/01 STP(U) 1,157 1,157 <br /> 1-5 interchange to Landfill site S CN 6/30/01 STP(E) 400 400 ' 6/1/01 <br /> Design and construct railway overcrossing • W Totals 8,890 3,000 4,569 16,459 500 9,173 <br /> 16 2 2 phases in project 4 S 0.5 C PE 2/1/00 247 130 377 <br /> Joint project with County-(City lead) 1 P CN 6/1/02 513 2,010 2523 2,523 No <br /> 112th Street SW Improvements T <br /> 112th Street SW 0 <br /> Airport Road to Evergreen Way(SR 99) S <br /> Design,construct 5 lane street with bike&ped improv. W Totals 760 2,140 2900 2523 <br />
The URL can be used to link to this page
Your browser does not support the video tag.