|
Washington State Department of Transportation Page 4 Six Year Transportation Improvement Program
<br /> Agency Everett From 2002 to 2007
<br /> County No. 31 Hearing Date
<br /> City No. 420 Adoption Date
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding Local Agency
<br /> C. Project Title RNV
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2002) (2003) (2004) 6th Type (MMM')
<br /> 1 2 3 4 5 6 7 8 _ 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 16 3 3 phases in project 4 S 1.1 C PE 6/1/96 525 787 1312
<br /> Joint project with Sno.County-(county lead) P RW 1/1/97 1,408 2,111 3,519 Yes
<br /> 112th Street SW-SE Improvements T CN 5/1/01 TIA 2,011 3,019 5,030 5,030
<br /> 112th Street SW-SE 0
<br /> Evergreen Way(SR 99) to 3rd Avenue SE S
<br /> Design,construct Slane street with bike&ped improv. W Totals 3944 5917 9861 5,030
<br /> 16 4 2 phases in project 1 S 1.1 S PE 9/1/01 1,000 1,000 1,000
<br /> P CN 6/1/03 3,300 3,000 6,300 6,300 EA No
<br /> Riverfront Parkway
<br /> Riverfront Parkway
<br /> 41st Street to Lowell River Road
<br /> Construct new minor arterial street Totals 4,300 3,000 7,300 1,000 6,300
<br /> 16 5 3 phases in project 4 S 1 C PE 1/1/02 600 600 1,200 1,200
<br /> P RW 5/1/02 1,000 1,000 2,000 1,500 500 Yes
<br /> 112th Street SE Improvements T CN 5/1/03 TIA 5,000 5,000 10,000 5,000 5,000
<br /> 112th Street SE 0
<br /> 3rd Avenue SE to 19th Avenue SE(SR 527) S
<br /> Design,construct S lane street with bike&ped improv. W Totals L 6,600 6,600 13,200 2,700 5,500' 5,000
<br /> 16 6 3 phases in project 4 P 0.9 C PE 5/1/03 TIA 360 1201 480 480
<br /> Joint project with Sno.County-(County Lead) P RW 9/1/03 387 129 516 516 No
<br /> 116th Street SE Improvements T CN 5/1/04 2,060 687 2,747 2,747
<br /> 116th Street SE S
<br /> SR 527 to 35th Avenue SE W ,
<br /> Design,construct 3 lane street with bike&ped improv. G Totals I 2,807 936 3,743 996 2,747
<br /> 16 7 2 phases in project 4 P 1 C PE ' 2/1/03 TIA 252 84 336 336 2,214
<br /> P CN 6/1/04 1,660 554 2,214 No
<br /> 100th Street SW Improvements T
<br /> 100th Street SW 0
<br /> Airport Road to Evergreen Way
<br /> Design,construct road widening&other improvements Totals _ 1,912 638 2,550 336 2,214
<br /> 17 1 3 phases in project - 5 P 1' C PE 5/1/03 500 100 600 600 EA
<br /> P RW 8/1/03 500 100 600 600 Yes
<br /> East Everett Park&Ride Lot and Access Improv. T CN 3/1/04 4,000 800 4,800 4,800
<br /> 36th Street,Broadway,and 41st Street 0
<br /> Smith Street to I-5
<br /> Design end construct Park and Ride Lot Access Totals 5,000 1,000 6,000 1,200 4,800 _
<br /> 17 2 3 phases in project 8 S 0.4 C PE' 7/1/99 Discret. 650 FM- 650 EA
<br /> P RW 8/1/00 STP(U) 865 SIB 317 1,182 Yes
<br /> California Street Overcrossing T CN 12/1/00 STP(U) 802 TPP 4,684 2,382 7,868 8,200
<br /> California Street 0 CN FAST 2,200 2,200
<br /> West Marine View Drive to Terminal Avenue .
<br /> Design and construct Arterial Overcrossing Totals 4,517 5,001 2,382 11,900 8,200
<br />
|