Laserfiche WebLink
Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program <br /> Agency Everett From 2002 to 2007 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title RAW <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2002) (2003) (2004) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 11 8 3 phases in project 1,6 P 0.3 0 PE 4/1/05 2,000 2,000 EIS <br /> RW 6/1/06 3,000 3,000 YES <br /> 1-5/Smith Island Freeway Interchange CN 5/1/07 20,000 20,000 <br /> 1-5 at 12th St.NE or other location on Smith Island <br /> 12th St.NE,or other location north of 12th St.NE <br /> Design and construct freeway interchange _ Totals 25,000 25,000 <br /> 12 1 1 phase in project 31 P 0 PE 9/1/02 250 250 250 <br /> 526/14 No <br /> SR 526/Hardeson Road Interchange Study <br /> SR 526 and Hardeson Road <br /> SR 526/Hardeson Rd. To SR 526/Hardeson Rd. <br /> Study possible interchange improvements Totals 250 250 _ 250 <br /> 14 1 4 phases in project 4 P -- 1.5 C PE 3/1/94 <br /> P RW 7/1/98 EIS Yes <br /> 19th Avenue SE(SR 527)Improvements T CN 6/1/02 TIA 6,584 1,216 7,800 2,770 3,400 <br /> 19th Avenue SE(SR 527) 0 CN 6/1/02 9,830 9,830 4,915 4,915 <br /> 112th Street SE to 132nd Street SE <br /> Design and construct addit.lanes,signal'moray.,etc. Totals 16,414 1,216 17,630 7,685 8,315 <br /> 14 2 2 phases in project 4 S 0.55 C PE 4/1/99 28 52 80 <br /> P CN 7/1/01 TIA 387 539 926 386 No <br /> Evergreen Way Imrpov.(110V-Emph.Lane Widen.) T <br /> Evergreen Way O <br /> 112th Street to Airport Road <br /> Design and construct roadway widening to seven lanes Totals 415 591 1,006 386 <br /> 14 3 HP-1998(021) 4 phases in project 4 Status 1.5 C PE 5/1/00 DEMO 732 468 1,200 500 700 EA <br /> P RW 6/1/02 DEMO 592 2,008 2,600 740 1,860 Yes <br /> East Marine View Drive Improvements T CN 4/1/03 DEMO 3,576 F.M. 600 4,024 8,200 750 4,445 3,005 <br /> East Marine View Drive 0 CN 6/1/03 <br /> North Broadway to Interstate 5 i <br /> Design,construct roadway widening and improvements Totals_ 4,900 _ 600 6,500 12,000 1,240 3,310 4,445 3,005 <br /> 14 4 3 phases in project 4 S 0.6 C PE 9/1/00 AIP 119 40 159 159 <br /> P RW 10/1/01 255 85 340 340 No <br /> Evergreen Way Widening T CN 7/1/02 900 300 1200 900 300 <br /> Evergreen Way-Rucker Avenue 0 <br /> 41st Street to 47th Street <br /> Design and construct widening from 5 to 7 lanes Totals 1274 425 1699 1399 300 <br /> 14 5 2 phases in project 3 S 0.2 C PE 10/1/00 TIA 45 22 67 45 <br /> P CN 6/1/02 455 228 683 683 No <br /> Broadway/Beverly Blvd.Intersection Improv. T <br /> So.Broadway, Beverly Boulevard 0 , <br /> Broadway at Beverly to SR 526 _ <br /> Design and construct intersection improvements Totals 500 2501 750 728 <br />