My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5067
>
Resolutions
>
Resolution 5067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 9:35:50 AM
Creation date
2/23/2017 9:35:23 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5067
Date
6/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 5 Six Year Transportation Improvement Program <br /> Agency Everett From 2002 to 2007 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total let 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2002) (2003) (2004) 6th Type (MMM') <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> i 17 3 2 phases in project <br /> 8 P 0.2 C PE 6/1/04 1,000 1,000 500 500 No <br /> Everett Ave.BNSF Overcrossing-Railway Ave. P CN 6/1/05 F.M. 5,000 4,000 9,000 9,000 <br /> Everett Evenue T <br /> East Grand Avenue to Railway Avenue 0 <br /> Design and construct arterial overcrossing Totals _ 5,000 5,000 10,000 500 9,000 <br /> 17 4 2 phases in project 5 P 0.1 C PE 1/1/03 TIA 30 10 40 <br /> P CN 7/1/03 160 40 200 200 No <br /> 16th Street Improvements T <br /> 16th Street 0 <br /> Maple Street to Walnut Street <br /> Design,construct road widening,intersection improv. Totals 190 50 240 240 <br /> 17 5 2 phases in project 5 P 0.1 C PE 6/1/03 18 11 29 29 <br /> P CN 6/1/04 AIP 231 139 370 370 No <br /> 37th Street Improvements T <br /> 37th Street Improvements 0 <br /> Rucker Avenue to Wetmore Avenue <br /> Design,construct road widening,intersec.impr. Totals 249 150 399 29 370 <br /> 17 6 2 phases in project 32 S 1.2 C PE 4/1/02 STP(E) 58 9 67 67 <br /> P RW 10/1/02 29 5 34 34 Yes <br /> Holly Drive Pedestrian Improvements T CN 5/1/03 230 36 266 266 <br /> Holly Drive Pedestrian Improvements 0 6/1/02 <br /> 100th Street SW to Airport Road <br /> Design and construct pedestrian improvements Totals 317 50 367 101 266 <br /> 17 7 1 phase in project 5 P 0 P PE 1/1/05 50 50 50 <br /> T RW 1/1/06 50 50 50 No <br /> Smith Island roadway improvements CN 7/1/06 400 400 400 <br /> various arterials on Smith Island <br /> various <br /> arterial street improvements Totals 500 500 500 <br /> 19 1 2 phases in project 12 S 00 C PE 3/1/01 STP(S) 90 48 138 CE <br /> P RW No <br /> • One-way to 2-way street conversion T CN 1/1/02 STP(S) 510 273 783 783 <br /> Hoyt Avenue and Wetmore Avenue 0 <br /> 19th St.to 32nd St.;19th St.to 37th St. • <br /> Design and construct 1-way to 2-way street conversions Totals 600 321 921 783 <br /> 19 2 2 phases in project 7 S ob 0 PE 1/1/02 <br /> CN 7/1/02 STP(U) 270 10,500 10,770 1,735 1,835 1,900 3,800 CE No <br /> Annual Street Overlay Program <br /> Various streets within City limits <br /> Various streets <br /> Resurfacing streets Totals 1 270 10,500 10,770 1,8351 1,900 1,900. 3,800 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.