Laserfiche WebLink
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 6 From 2002 to 2007 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title RM/ <br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2002) (2003) (2004) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 9 _ 9 10 11 12 13 14 15 16 17 19 19 20 21 <br /> 19 3 STPE-0420(002) 1 phase in project 32 S 2 P CN 5/1/02 STP(E) 44 11 55 55 CE <br /> O No <br /> Riverfront Walkway Phase I <br /> Riverfront Walkway <br /> Lenora Street to Pacific Avenue <br /> Construct blade-ped path along Snohomish River Totals I 44 11 55 55 <br /> 19 4 STPE-EN94(013) 1 phase in project 32 S 0.10 CN 5/1/03 STP(E) 400 100 500 500 EA <br /> I No <br /> Riverfront Walkway Overcrossing <br /> Riverfront Walkway I <br /> BNSF Overcrossing to BNSF Overcrossing <br /> Construct pedestrian overcrossing of BNSF Railway Totals 400 100 500 1 500 <br /> 19 5 STPE-EN94(014) 2 phases in project 32 S 3.6 P PE 5/1/01 STP(E) 84 21 105 1051CE <br /> O CN 9/1/01 675 110 785 7851 No <br /> Riverfront Walkway Phase II <br /> . Pacific Ave.,E.Grand Ave.,E.Marine View Drive <br /> Pacific Ave./Smith Ave. To North Broadway <br /> Design and construct bicycle-pedestrian path Totals 759 131 890 890 <br /> 19 6 1 phase in project 12 P 00 C CN 5/1/02 240 240 40 40 40 120 <br /> P No <br /> Traffic Signal Interconnect T <br /> Various locations within City limits <br /> Various streets to Various streets <br /> 9 <br /> Construct traffic signal interconnect Totals 240 240 40 40 40 120 <br /> 19 7 2 phases in project 12 S 00 0 PE 1/1/02 <br /> CN 5/1/02 210 210 35 35 35 105 No <br /> Pavement Marking Project <br /> Various locations within City limits I <br /> I <br /> Various streets to Various streets <br /> Install pavement markings in various locations Totals 210 210 35 35 35 105 <br /> 19 8 2 phases in project 08 P 0.2 PE 4/1/01 STP(E) 149 301 450 400 50 EA <br /> CN 4/1/04 STP(E) 300 945 1,245 1,295 1,000 No <br /> 1-5/Snohomish River Bicycle-Ped Bridge CN 4/1/04 IAC 300 300 <br /> Interstate 5 CN 4/1/04 ALEA 750 750 <br /> East Marine View Drive to Langus Riv'fl.Park <br /> Design,cosnbuct bike-ped bridge over Snohomish River Totals 449 1,050 1,246 2,745 400 50 1,295 1,000 <br /> 19 9 3 phases in project 01 P 0.1 C PE 1/1/02 100 100 100 <br /> S RW Yes <br /> 106th Place SE Improvements G CN 6/1/02 350 350 350 <br /> 106th Place SE P <br /> 16th Avenue SE to 19th Avenue SE(SR 527) T <br /> Design and construct street 6 signal improvements W _ Totals — 450 .450 450 <br />